CUCC Expeditions to Austria: 1976 - 2022
Home
|
CUCC
|
expo.survex
|
Handbook
|
Log in
264
|
290
|
359
|
Survex
|
All Survex
|
Scans
|
Upload Scans
|
Drawings
|
Upload Drawings
|
Upload Photos
|
290 (FGH)
|
359 (Homecoming)
|
Data Issues
|
tasks to do
|
caves
|
QMs
|
ents
|
expoers
|
survey lengths
|
statistics
|
Wallets(2019)
|
Expo(2019)
|
import/export
|
Django admin
Survex File: caves-1623/161/triassic/intrview
;created Expo 96 ;1996.12.04 AJD in pt5, leg 1-2, the 062 in the notes _must_ be wrong ; (from pics/memory/closure), 032 guessed ;1998.03.26 AERW sort begin/end, add comments, refs, *calib clino *begin interview ; Cave: 1623/161, Kaninchenhöhle ; Locn: Totes Gebirge, Austria *title "Interview Blues (QM 95-55)" *export pt1.1 pt5.1 ; ====== links between surveys making up the Interview survey: ====== *equate pt1.13 pt2.1 *equate pt2.11 pt3.1 pt4.1 *equate pt5.10 pt4.9 ;*equate minoancon.plumb pt5.9 ; survey so awful it has been removed *equate pt3.20 pt6.13 *equate pt6.27 pt7.21 *begin pt1 *title "Interview Blues Part 1 - Gizza Job to the Doledrums" *team Insts Anthony Day *team Notes Nick Procter *team Pics Nick Procter *team Tape Anthony Day *date 1996.07.14 ; - trip 1996-161-13 in logbook *instrument Set 2 132004, 838638 [W, 194703] ; Calibration: 161d entrance ; A - B 213 213 213 ; +08 +08 +08 ; B - A 033 033 033.5 ; -09 -09 -08 ; Ref.: 1996 KH survey book pp 86-89 ; ====== stations refindable to link to other surveys: ====== *export 1 ; CM boulder 's5', NE side of Trifurcation *export 4 ; CM on top of boulder at edge of Gizza job (needed to survey Fear-on ; traverse, meeting room pitch and QM 96-11 *export 13 ; foot of plumb of the Doledrums pitch (note location will depend on the ; length of sling used on the deviation on this pitch, so not useful for ; future years :-( *calibrate clino -0.33 *calibrate tape +0.2 ;From to Tape Compass Clino 2 1 7.84 215 -27 2 3 13.35 033 +18 4 3 6.03 226 -02 5 4 5.48 192 +72 5 6 10.13 - down 6 7 11.85 - down 8 7 2.11 293 -29 8 9 3.26 056 +06 9 10 6.84 - down 11 10 3.58 223 -37 12 11 2.43 264 +59 12 13 7.84 - down ; LRUD data in book, not yet added (1996KHp86) *end pt1 *begin pt2 *title "Interview Blues Part 2 pitch 4 -> top pitch 5" *team Insts Nick Procter *team Notes Paul Hammond *team Pics Paul Hammond *team Tape Nick Procter *date 1996.07.17 ; - trip 1996-161-25 in logbook *instrument Set 4 ; Calibration: 161d entrance ; A - B 215 214 214 ; +09 +09 +08 ; B - A 034 034 033.5 ; -08 -08 -08 ; ; Ref.: 1996 KH survey book pp 124-125 ; ====== stations refindable to link to other surveys: ====== *export 1 ; foot of plumb of the Doledrums pitch (note location will depend on the ; length of sling used on the deviation on this pitch, so not useful for ; future years :-( *export 11 ; CM on wall above Application for Life, also nearest QM 96-01 *calibrate clino +0.33 *calibrate tape +0.2 ;From to Tape Compass Clino 2 1 1.50 349 -10 2 3 0.93 107 -50 4 3 5.16 322 +72 4 5 10.90 - down 6 5 6.00 347 -29 6 7 3.59 187 -20 8 7 3.31 072 +04 8 9 10.46 224 +08 10 8 4.00 004 -16 11 10 6.37 289 +07 ; LRUD data for all except station 4 1996KHp124, yet to add *end pt2 *begin pt3 *title "Interview Blues Part 3" *team Insts Becca Lawson *team Notes Anthony Day *team Pics Anthony Day *team Tape Both *date 1996.07.20 ; - trip 1996-161-39 in logbook *instrument Set 1 ; Calibration: 161d entrance ; A - B 216 ; +07 ; B - A 033 ; -09 ; ; Ref.: 1996 KH survey book pp 152-153 ; ====== stations refindable to link to other surveys: ====== *export 1 ; CM on wall above Application for Life *export 20 ; CM RH wall after traverse forward from Volvo facing way to Early Retirement *calibrate clino -1.0 *calibrate tape -0.155 ;From to Tape Compass Clino 1 2 1.70 282 -16 2 3 2.93 060 -40 4 3 11.17 205 +73 *calibrate tape 0 4 5 38.5 - down ; measured the following day because ; tape shagged AJD *calibrate tape -0.155 6 5 5.09 282 -27 6 7 5.32 126 +08 7 8 4.20 153 -16 8 9 2.24 238 -20 10 9 3.21 353 +39 10 11 3.85 192 +03 11 12 3.13 110 -69 12 13 13.01 - down 14 13 2.68 318 -60 14 15 3.78 095 -22 15 16 16.41 - down ;tape measurement + diameter of reel 16 17 4.80 - down 18 17 4.11 165 -01 18 19 7.15 048 +19 20 19 4.65 002 +02 ; LRUD data for most points (not those on pitches) 1996KHp152, yet to add *end pt3 *begin pt4 *title "Interview Blues part 4 - top pitch 5 -> spatial awareness" *team Insts Nick Proctor *team Notes Brian Outram *team Pics Brian *team Tape Nick *team tape Brian *date 1996.07.23 ; trip 1996-161-52 in logbook *instrument Set 4 ; Calibration: None ; ; Ref.: 1996 KH survey book pp 139-140 ; ====== stations refindable to link to other surveys: ====== *export 1 ; CM on wall above Application for Life *export 9 ; CM on rock at base of How Far to Tooting ? *calibrate tape -0.22 ;From to Tape Compass Clino 1 2 4.12 242 +29 3 2 10.76 039 -37 4 3 2.84 081 -47 5 4 6.37 035 -06 5 6 5.09 205 -17 7 6 5.62 013 +27 8 7 4.30 043 +07 8 9 9.10 - down 10 9 2.70 265 -33 11 10 5.50 071 +45 ; LRUD data for all points, 1996KHp139, yet to add *end pt4 *begin pt5 *title "Interview Blues part 5" *team Insts Craig Anderson *team Notes Nick Procter *team Pics Nick Procter *team Tape Craig Anderson *team Tape Nick Procter *date 1996.07.28 ; - trip 1996-161-67 in logbook *instrument Set 4 ; Calibration: At 161d ; A - B 216 215 215.5 ; +08 +09 +08.5 ; B - A 034 034 034 ; -09 -08 -08 ; *ref "1996 KH survey book pp 179-182" ; ====== stations refindable to link to other surveys: ====== *export 1 ; CM on RH wall *export 9 ; foot of tape plumb from Minoan Surprise *export 10 ; CM on rock at base of How Far to Tooting ? ;From to Tape Compass Clino *calibrate tape +0.2 1 2 12.25 032 -33 ; AJD the 062 in the notes _must_ be wrong, 032 guessed 3 2 6.90 292 -34 3 4 6.93 004 +01 3 5 2.52 053 +28 6 5 20.85 - down 7 6 8.96 171 -73 8 7 4.06 202 -31 8 9 5.00 306 +06 ; notes say tape is a guess 10 8 10.60 206 -11 ; notes say 10 to 9, flagged as wrong 96KHp179 ; LRUD data for most stations 96KHp179 not yet added *end pt5 ;*begin minoancon ;*title "Connection to Minoan Surprise" ;*team Insts Craig Anderson ;*team Notes Nick Procter ;*team Pics Nick Procter ;*team Tape Both ;*date 1996.07.28 ; - trip 1996-161-67 in logbook ;*instrument Set 4 ; Calibration: At 161d ; A - B 216 215 215.5 ; +08 +09 +08.5 ; B - A 034 034 034 ; -09 -08 -08 ; ; Ref.: 1996 KH survey book p 179 ; ; The plumb on the following survey is the biggest load of bollocks out and ; completely screws up the loop through chaos, therefore it has been removed. ; AJD, 4 Aug 96 [ AERW 98.03.25: The plumb appears to be c 15m too big, and ; there is a considerable horizontal misclosure too. The size and direction ; of the error suggest that there is a gross error elsewhere - even if the ; plumb was misheard, the horizontal misclosure couldn't have been caused by ; it alone... ] ; ; ====== stations refindable to link to other surveys: ====== ; ;*export 1 ; 's9' CM rock, between the three Minoan Surprise pitches (probably) ;*export plumb ; foot of tape plumb from Minoan Surprise ; ;*calibrate tape +0.2 ;1 2 4.90 001 -08 ;2 3 8.47 078 -32 ;3 plumb 54.52 - down ;*end minoancon *begin pt6 *title "Interview blues part 6" ; Early Retirement, Gravy Train, Mid-Life Crisis to the Daily Grind *team Insts Craig Anderson *team Notes Nick Procter *team Pics Nick Procter *team Tape Both *date 1996.07.29 ; - trip 1996-161-71 in logbook *instrument Set 3 ; Calibration: At 161d ; A - B 214 215 215.5 ; +07.5 +08 +08 ; B - A 035 034 034 ; -08.5 -08 -08 ; ; Ref.: 1996 KH survey book pp 183-186 ; ====== stations refindable to link to other surveys: ====== *export 1 ; CM on RH (east) wall on edge of unexplored pitch QM 96-02 *export 13 ; CM RH wall after traverse forward from Volvo facing way to Early Retirement *export 27 ; CM on left (east) wall of Daily Grind just before head of the End is Nigh *calibrate clino -0.17 *calibrate tape +0.2 ;From to Tape Compass Clino 2 1 3.18 016 -17 2 3 3.08 172.5 +30 3 4 1.83 201 -52 4 5 0.45 - down 6 5 2.06 302 +19 7 6 1.18 294.5 -09 8 7 1.72 227 -21 9 8 3.90 339 +02 10 9 10.05 011.5 +08 10 11 4.90 173 -39 11 12 5.55 207 -46 13 12 4.38 119 -24 13 14 4.00 180 +15 14 15 3.55 197 -29 15 16 3.06 175.5 +18 16 17 2.27 214 +44 17 18 2.64 217 -17 18 19 3.28 202.5 +01 19 20 2.64 239 -13 20 21 6.46 140 -13 22 21 3.10 020 +44 22 23 10.85 - down 24 23 8.23 042 +03 25 24 3.48 327 -05 26 25 3.38 299 +22 27 26 1.35 292 +04 ; LRUD data for most stations 96KHp183 not yet added *end pt6 *begin pt7 *title "Interview blues part 7 - top pitch 9 -> bottom pitch 10" *team Insts Nick Procter *team Notes Brian Outram *team Pics Brian Outram *team Tape Both *date 1996.07.30 ; - trip 1996-161-72 in logbook *instrument Set 4 ; Calibration: At 161d ; A - B 215 214 214 ; +08 +08 +08 ; B - A 035 034 034 ; -08 -09 -08 ; ; Ref.: 1996 KH survey book pp 176-178 ; ====== stations refindable to link to other surveys: ====== *export 4 ; CM on right wall (outside of bend) opposite head of QM 96-03 *export 6 ; CM on R wall just at entry to chamber. QM 96-10 2m further NE *export 9 ; CM on choss wall, end of RH branch. QMs 96-04, 96-05 to right *export 10 ; CM on wall at top of "T"of T-jn, right to QMs 96-06, 96-07, 96-08 *export 11 ; CM SW wall (left branch) just NW of entry to QM 96-09 *export 21 ; CM on left (east) wall of Daily Grind just before head of the End is Nigh *calibrate clino -0.17 *calibrate tape +0.2 ;From to Tape Compass Clino 2 1 6.50 204 -16 2 3 8.10 029 +24 4 3 2.40 290 -08 5 4 4.97 188 -18 6 5 4.25 197 -10 7 6 9.90 142 -12 ; notes say 6-7 8 7 3.95 359 +03 ; notes say 7-8 9 7 8.90 167 -07 ; notes say 7-9 9 10 5.25 226 -20 11 10 8.46 337 +05 8 11 2.67 293 -06 ;12 8 no tape 296 -08 13 6 2.50 107 +09 14 13 16.80 - down ; notes say 13-14 down - obvious bollocks 15 14 20.75 - down ; clino reading -87, no compass 16 15 3.13 262 -54 16 17 7.18 332 +12 17 18 2.60 340 -09 19 18 37.00 - down 20 19 11.70 - down 21 20 1.00 155 +05 ; LRUD data for most stations 96KHp176 not yet added *end pt7 *end interview
No differences - file was saved