CUCC Expeditions to Austria: 1976 - 2022
Home
|
CUCC
|
expo.survex
|
Handbook
|
Log in
264
|
290
|
359
|
Survex
|
All Survex
|
Scans
|
Upload Scans
|
Drawings
|
Upload Drawings
|
Upload Photos
|
290 (FGH)
|
264 (Balkonhöhle)
|
Data Issues
|
tasks to do
|
caves
|
QMs
|
ents
|
expoers
|
survey lengths
|
statistics
|
Wallets(2022)
|
Expo(2022)
|
Control panel
|
Survex File: caves-1623/161/north/yapate
;1993.07.?? RH route data split up ;1993.12.28 SOKB connection checked ;1996.03.17 (W)reversed leg 3-4 in Toilet block fixed ;1998.02.09 AERW added refs, details, exports, deleted redundant data used elsewhere *equate Yapate.5 Toilet.10 SOKBconn.5 *equate Sheared.12 SOKBconn.SOKBn *begin Yapate *title "Waterfall Chamber to top of Flapjack" *date 1989.08.15 ; trip 1989-161-21 in logbook *team Notes Dan *instrument Tina *team Dogs Jeremy, JulianT *ref " 1989 survey book pp 36-38" *export 0 ; top of rock/sand col between Tower Blocks and Waterfall Cha. marked "15" *export 5 ; roof at Carrefour *export 10 ; RH wall before traverse over Gob, point marked "S" *export 12 ; edge of Flapjack pitch *export 16 ; 2m up wall opposite foot of 11m pitch (Flapjack 3rd) ; ;waterfall chamber 0 1 8.75 275 -20 2 1 10.73 234 +27 2 3 16.40 311 -16 4 3 13.33 191 +02 4 5 12.76 330 +08 ; 5 roof at carrefour 6 5 29.12 201 -01 ;to end of yapate 6 7 24.50 023 +11 8 7 11.40 144 -05 8 9 11.48 343 +12 10 9 22.85 182 -11 ; 10 is point marked 'S' ;towards flapjack 11 5 15.94 035 +01 11 12 6.18 191 -12 ;heading down flapjack 12 13 33.51 - down 13 14 9.90 292 -33 14 15 12.28 260 -76 15 16 9.71 301 -69 *end Yapate *begin Toilet *title "Toilet Block" *date 1989.08.15 ; trip 1989-161-21 in logbook *team Notes Jeremy *instrument Tina *ref " 1989 survey book pp 39-40" *export 10 ; roof at Carrefour 2 1 5.50 - down 2 3 1.34 088 +74 4 3 4.78 231 +04 4 5 8.93 162 -14 6 5 6.67 278 -13 6 7 12.23 113 -06 8 7 7.43 281 -18 8 9 6.00 114 -39 10 9 16.45 344 -11 *end Toilet *begin SOKBconn ; Cave: 1623/161, Kaninchenhöhle ; Locn: Totes Gebirge, Austria *title "connection of SOKB at Carrefour (on Pipeless survey trip)" *date 1992.07.23 ; trip 1992-161-9 in logbook *team Inst Jerry Williams *team Tape *team Notes Wookey *instrument Compass: illum, Clino: illum ; Calibration: 042.5,041.5; +08.5,+08.5 -09,-09 *export SOKBn ; carbide mark on shaft wall opposite hang bolt for p20 *export 5 ; roof at Carrefour *calibrate clino -0.25 *ref " 1992 survey book p 126" SOKBn 5 6.48 204 +49 *end SOKBconn *begin Sheared ; Cave: 1623/161, Kaninchenhöhle ; Locn: Totes Gebirge, Austria *title "Sheared Off Known Better" *date 1990.08.06 ; trip 1990-161-40 in logbook *team Inst Dave F *team Notes Del *instrument Compass 68493x, Clino 73638x (last digits off edge of p/copy) ; Calibration: *ref " 1990 survey book pp 82-84" *export 1 ; carbide mark "S" RH wall at limit of exploration (QM 90-06) *export 12 ; carbide mark on shaft wall opposite hang bolt for p20 1 2 5.58 068 +58.5 3 2 5.05 251 -48 3 4 4.61 068 +15 5 4 3.88 262 +20 5 6 2.25 015 -18 7 6 13.05 - down 8 7 5.00 187 -39 8 9 1.74 104 -14 10 9 2.86 142 +16 10 11 7.40 077 -05 12 11 20.02 200 -81 12 13 1.27 147 +59 14 13 7.90 158 -19 15 13 6.20 156 -17.5 ; pt 15 is cairn by toilet block (not used for link) *end Sheared
No differences - file was saved