204 - Gaffered - Earthenware / Hardware

2005 calendar page     full logbook     logbook report

place: 204

Tue 26 Jul 2005    Wed 27 Jul 2005

CaverT/UPrevNext
Becka Mon 25 Jul 2005 Wed 27 Jul 2005
Nial Sat 23 Jul 2005 Wed 27 Jul 2005
Wookey Sat 23 Jul 2005 Thu 28 Jul 2005
Tue 26 Jul 2005
Becka



Scored lots of QM's between Earthenware and Hardware, surveying lots of loops and trying to make sense of the survey. Mostly ticked things off, just leaving a QM down a narrow, rifty passage with a small stream in it. Going to be a pig to draw. Dave had made a blown-up laminated survey just of Subsoil which was the bee's knees for checking off QM's + re-finding survey stations.

Edit this entry.

Survex files on this date:
    caves-1623/2005-92/2005-92
    caves-1623/2005-93/2005-93
    caves-1623/2005-94/2005-94
    caves-1623/2005-95/2005-95
    caves-1623/2005-96/2005-96
    caves-1623/204/subsoil/someware
    surface/1623/104surf
Wallets on this date:
    2005#04 ['notes4', 'notes2', 'notes1', 'notes3']
    2005#05 ['notes2', 'notes1']
Logbook trips on this date:
    Loser Plateau - Surface work near Brave New World
    204 - Gaffered - Earthenware / Hardware