204 - Gaffered - Earthenware / Hardware
Tue 26 Jul 2005
Becka
Becka
Scored lots of QM's between Earthenware and Hardware, surveying lots of loops and trying to make sense of the survey. Mostly ticked things off, just leaving a QM down a narrow, rifty passage with a small stream in it. Going to be a pig to draw. Dave had made a blown-up laminated survey just of Subsoil which was the bee's knees for checking off QM's + re-finding survey stations.