CUCC Expeditions to Austria: 1976 - 2022
Home
|
CUCC
|
expo.survex
|
Handbook
|
Log in
264
|
290
|
359
|
Survex
|
All Survex
|
Scans
|
Upload Scans
|
Drawings
|
Upload Drawings
|
Upload Photos
|
290 (FGH)
|
264 (Balkonhöhle)
|
Data Issues
|
tasks to do
|
caves
|
QMs
|
ents
|
expoers
|
survey lengths
|
statistics
|
Wallets(2022)
|
Expo(2022)
|
import/export
|
Django admin
Survex File: caves-1623/161/rhr/olympus
; 1993.07.15 split into useful sized chunks/original surveys ; 1998.02.09 AERW added refs, station details, exports, split into two trips *begin olympus ; ====== stations refindable to link to other surveys: ====== *export pt1.0 ; point on SE wall (opposite large pillar which looks like wall) ; in Tower Blocks where Olympus goes off to the SW *export pt2.75 ; carbide mark on bottom of flake in roof in Wobbling, ; directly opposite entry to Wormhole *export pt2.dan12 ; edge of Flapjack pitch (seen across pitch to Flapjack surveyors) ; ====== links between surveys making up the Olympus survey: ====== *equate pt1.43 pt2.43 *equate pt1.36 pt2.36 *begin pt1 ; Cave: Kaninchenhöhle (1623/161) *title "Olympus" *date 1989.08.20 ; 21 - trip 1989-161-26 in 1989 logbook *team Notes Wook *instrument Del *instrument compass: 543693, clino: 545763 *ref " 1989 survey book pp 42-43" ; ====== stations refindable to link to other surveys: ====== *export 0 ; point on SE wall (opposite large pillar which looks like wall) ; in Tower Blocks where Olympus goes off to the SW *export 36 ; LH wall 3m off floor *export 43 ; rock tip 1m from edge of pitch, 2m from R, L & back walls 0 33 10.12 232 -17 ; Start of olympus 34 33 12.64 021 05 34 35 6.57 183 -15 36 35 16.81 029 -04 36 37 12.00 066 05 ; corner where B-meal goes off 38 37 20.40 359 -21 38 39 10.76 186 34 40 39 10.40 355 -37 40 41 5.96 026 35 42 41 3.96 325 14 42 43 7.22 191 10 ; 33 nondescript rock tip 0.3m off floor ; 34 LH roof 0.3 off floor ; 35 carbide mark, RH wall 1.5 off floor ; 36 LH wall 3m off floor ; 37 carbide mark, LH wall 1.5m off floor ; 38 LH wall 0.5 from wall, 4.5m wide, 12m high ; 39 RH wall 2m off floor, 2.6 wide, 8m high overall ; 40 LH wall 2m off floor, 2m wide at this level, wider high up, roof OOS ; 41 rock on LH wall at top of climb, 1.2 wide, 3.5 high ; 42 0.5 off floor, 1.2 from LH wall, 3.1 wide, 8m high ; 43 rock tip 1m from edge of pitch, 2m from R, L & back walls *end pt1 *begin pt2 *title "Olympus" *date 1989.08.26 ; 27 - trip 1989-161-31 in 1989 logbook *team Notes Wook *instrument Dan *instrument ; ====== stations refindable to link to other surveys: ====== *export 36 ; LH wall 3m off floor *export 43 ; rock tip 1m from edge of pitch, 2m from R, L & back walls *export 75 ; carbide mark on bottom of flake in roof in Wobbling, ; directly opposite entry to Wormhole *export 100 ; T-junction opposite Del's climb QM 89-03 *export dan12 ; edge of Flapjack pitch (seen across pitch to Flapjack surveyors) ; B-Meal - page 47 in 1989 survey book 43 44 10.39 141 -34 45 44 4.13 166 51 46 45 6.93 254 50 46 47 3.91 097 -07 48 47 6.20 120 79 ; 44 far wall of chamber 1m above rubble floor ; 45 pitch head bolt ; 46 LH wall of rift 1m wide 2m above floor 1.3 into rift 10m high ; 47 RH wall of rift 2m above constriction 4m from roof ; 48 LH wall of rift 2m above bottom of rift 2m wide ; survey continues - pages 48-51 ; Wobbling 36 70 12.80 237 -21 71 70 9.91 053 09 71 72 7.27 176 -09 73 72 3.48 044 31 73 74 2.75 175 -24 75 74 2.03 015 16 75 76 4.77 181 -72 76 77 2.27 196 -19 ; 36 LH wall on corner 4m off floor (was 3m in pt1, see above) ; 70 1.4 up on RH wall ; 71 2m up at junction of Wobbling and choked shingle inlet ; 72 1.5m up in 1m wide rift, 2.5m high, mud floor ; 73 RH wall, 1m wide, 3m up, roof 2m above ; 74 2m up, LH wall ; 75 on the roof (CM on flake SE side opposite way to Wormhole), rift 3m high, 0.4 wide ; 76 0.8 above floor, rh wall 0.3m wide ; 77 0.4 off floor centre of passage ; main olympus passage 71 78 15.93 031 +17 79 78 10.05 050 +01 80 78 3.67 167 +05 80 81 6.57 243 -13 82 81 11.35 184 -13 82 83 6.08 038 -17 84 83 8.21 180 -12 84 85 8.59 342 -07 86 85 9.13 219 -12 86 87 25.16 001 -03 88 87 9.36 208 +01 88 89 18.79 230 -04 90 89 9.75 219 +06 90 91 6.73 057 +36 92 91 7.32 228 +09 92 93 10.22 049 00 93 94 10.96 067 -11 95 94 10.21 086 +09 95 96 5.51 267 +31 99 96 19.87 061 +07 ; chambery bit over flapjack pitch 97 96 14.72 180 -27 98 96 9.99 132 -23 ; passage in opposite direction 99 100 3.30 014 -33 101 100 5.76 088 -11 101 102 6.30 231 -08 103 102 4.26 106 -40 103 104 6.28 201 +21 105 104 5.80 048 +27 ; 99 106 3.16 156 -03 107 106 6.11 308 -07 107 90 5.04 117 +30 ; connection at head of flapjack pitches dan12 94 1.94 285 -81 ; 78 0.6 off shingle floor ; 79 shingled up inlet ; 80 RH wall 1.3 off floor ; 81 0.2m up on LH wall ; 82 1.9m up LH wall, 6m aven 1m in front of point ; 83 0.2 off floor. RH wall in shingle crawl 2m wide ; 84 1m up in roof, 0.5 to highest point, 2.5 wide arch, 0.5 from RH wall ; 85 0.2 up LH wall 2.5 wide 1.2 high arch ; 86 2m up RH wall, 3.5 wide ; 87 1.9 above floor ; 88 RH wall 2m up ; 89 LH wall 1.6 up ; 90 RH wall 3m up. 10m hading rift 0.7 wide, LH (hanging) wall is missing ; at bottom: forms approx rectangular passage 4m wide at floor, 5m high ; 91 LH wall of rift 3m up, 0.7 wide ; 92 constriction in rift, centre of roof 1m off floor, 0.6 wide ; 93 edge of flapjack, 1.3m up RH wall ; 94 pinnacle 0.5 above 2nd bolt of flapjack pitch ; 95 1m from edge of pitch ; 96 roof 1.2 above floor ; 97 top of rock slope, 4m from end of chamber, 2m off floor ; 98 4m from floor on wall ; 99 1m from floor, 3m to roof, 0.8 wide ;100 tip of roof pinnacle, 1.2 from floor ;101 RH wall 1m up, 2.5 wide, 3m high ;102 LH wall 0.2 above floor 2m wide ;103 RH wall 1m up, 1.5 wide at base of rift 9m high ;104 2m up LH wall 0.8 wide, 3m to roof ;105 1m up wall, 2m from end wall, roof closes down from 2m high at point ;106 RH wall 0.9 up, 2.4 high, 1.5 wide ;107 LH wall 0.8 up, 4m high 4.5 wide *end pt2 *end Olympus
No differences - file was saved