Fischgesicht - Derig Kresh Connection
Gwenllian Tawy
The aim for this trip was to de-rig the traverse into Happy Butterfly and everything above it, excluding the entrance pitch. We quickly made it down to the traverse whre Rachel pointed the way on to Happy Butterfly, which she had de-rigged the previous day. Here, we decided to split into two groups.
Keiran and Rachel looked at a lead above the traverse, while Dinny rigged a rope into the rift below for me to descend. It appeared that Keiran and Rachel's passage was an oxbow back into the top of the rift I was exploring. The rift I was in had two survey stations at the bottom (1.5 and 36 - since located on HB survey). The rift ended in a pitch which has previously been dropped as there were bolts at the pitch head.
After ruling out any other leads we turned to de-rigging. Rachel head out first with a couple of bags while I assisted Keiran with derigging the lower pitches. I then derigged the last pitches with Dinny's assistance.