204 Pingu pitch - bottom right
Wed 03 Aug 2011
Fernando Abarquero
Fernando Abarquero
Back in Pingu Pitch with the drill and lots of rope ready to do the bolting and abseiling of the central pitch. Gareth bolted an impressive free hanging belay. Unfortunately it ended in a little sump and going nowhere else. We did all the surveying and the de rigging until Pingu's rope decided that it wanted to stay there for a little bit longer :(