161 - France

Tue 12 Jul 1994
Helen Twelftree

Went back to finish rigging/surveying/derigging, Ralph jacked due to a knackered leg. Rigged the new pitch ("Top Loader") with a Y-hang from the bottom of the rift pitch ("Standard deviation"), then a deviation off the right hand wall for a free hang down the pitch (which is jolly fast on 9mm). "Top Loader" comes out into "Washer" as expected. Rope rubs a bit so we all went out via the usual route to Algeria, some surveying got done, as did the derigging.

Edit this entry.

Survex files on this date:
    caves-1623/161/france/toplo
No wallets files found for this date.
Logbook trips on this date:
    161 - France
    161 - Gnome