CUCC Expeditions to Austria: 1976 - 2022
Home
|
CUCC
|
expo.survex
|
Handbook
|
Log in
264
|
290
|
359
|
Survex
|
All Survex
|
Scans
|
Upload Scans
|
Drawings
|
Upload Drawings
|
Upload Photos
|
290 (FGH)
|
264 (Balkonhöhle)
|
Data Issues
|
tasks to do
|
caves
|
QMs
|
ents
|
expoers
|
survey lengths
|
statistics
|
Wallets(2022)
|
Expo(2022)
|
Control panel
|
Survex File: caves-1623/142/cucc/cucc142
;NOTES > $.Survey.Surveys.Austria.D.P142 ;1995.08.01 AERW Source: converted from SU file *equate 142.142Ent.0 p142 *entrance p142 ; ====== links between surveys in this file: ====== *begin 142 ; Locn: SE flank Vord. Schwarzmooskogel, Western massif, Totes Gebirge, Austria *title "Stellerweghöhle back entrance, 1623/142" *export 142to41.1 *export 142ent.0 *equate 142To41.15 142Ent.34 *equate 142To41.50 142Ent.18 *equate 41to142.bolt 142Ent.39 *equate 142side.14 142to41.53 ;*equate 41to142.13 41ent.19 *equate 142Bcha.1 41to142.0 *begin 142Ent ; formerly "VD" survey *title "Entrance series" *date 1983 *team Insts Mike Thomas *team Tape *team Notes Dave Brindle *instrument unknown ; Calibration: None *ref " photocopy dated 22 AUG 1983 of original notes (supplied by Phil" ; Sargent I think, or maybe it was Mike Martin, in AERW's archive) ; NB there are NO STATION NUMBERS in original notes - all have been ; deduced from numbers on the sketch ; ====== stations refindable to link to other surveys: ====== *export 0 ; bolt at entrance ;*export 14 ; cairn above ramp intended for future survey (not used) *export 18 ; group of boulders on RH wall after passing top of ramp ; with a pillar *export 34 ; prominent boulder in chamber below ramp up towards the Big ; chamber (and, as it happens, the way in from 1623/78) ; note station 35 is not relocatable, but is next to 1623/78 connection *export 39 ; bolt at top of 32m pitch into Big Chamber ;CHANGE 0.0 0.0 1983 Survey - no compass problems ;GRADE USE 5N 0 1 1. - Down 1 2 4.6 75. -49. 2 3 4.18 123.5 -33. 3 4 3.14 79. -37. 4 5 2.65 63. -50. 5 6 5.9 93. -4. 6 7 5.0 166. -72. 7 8 3.42 254. -24. 8 9 11.05 353. -4. 9 10 3.35 335. -16. 10 11 5.12 31. -16. 11 12 9.02 4. -7. 12 13 6.15 8. -17. 13 14 7.77 54. -17. 14 15 11.92 357. -6. 15 16 16.4 34. 6. 16 17 7.9 358. 33. 17 18 14.15 15. 36. 18 19 16.02 18. 23. 19 20 11.8 49. -5. 20 21 2.48 104. -21. 21 22 15.16 28. 1. 22 23 3.71 14. -9. 23 24 3.72 45. 9. 24 25 9.14 26. -26. 25 26 5.34 349. 15. 26 27 10.62 20. -13. 27 28 4.40 32. -22. 28 29 6.60 32. 11. 29 30 12.62 42. 4. 30 31 3.45 18. -5. 31 32 3.61 91. 29. 32 33 3.50 34. -9. 33 34 11.04 31. -53. 34 35 15.77 289. 43. 35 36 8.91 1. 5. 36 37 10.56 43. -10. 37 38 2.90 86. -13. 38 39 10.40 61. -58. 39 40 32. - Down 40 41 7.95 218. -2. 41 42 29.70 231. -16. 42 43 16.50 229. -9. 40 44 27.85 39. 11. 40 45 12.56 279. -7. 45 46 10.04 346. -21. 46 47 24.70 44. -22. 47 48 11.95 352. -26. *end 142Ent *begin 142To41 ; formerly "SR" survey *date 1983.08.09 *team Insts *team Tape *team Notes Gail Smith *instrument Compass 949847, Clino 113782 ; Calibration: None ; Ref. very scrotty photocopy of original notes in AERW's archive, almost ; certainly supplied by Phil Sargent ; ====== stations refindable to link to other surveys: ====== *export 1 ; top of boulder in chamber below 18m pitch in 41 *export 15 ; mark on boulder in corner chamber before Big Chamber *export 50 ; group of boulders on right past rubble pillar *export 53 ; in middle of passage - painted cairn 1 2 9.40 288. 39. 3 2 16.46 119. -22. 3 4 7.21 301. 25. 5 4 7.85 73. 11. 5 6 8.33 138. -27. 7 6 20.50 47. 30. 7 8 5.43 249. -6.5 9 8 3.87 156. -46.5 9 10 7.23 285. 23. 11 10 3.71 178. -25. 11 12 10.86 294. 32. 13 12 12.00 72.5 37. 13 14 5.36 212.5 -35. 15 14 5.84 270. 34. ; VD34=SR15 AT CORNER BEFORE BIG CHA. 50 51 9.14 174. -35. 52 51 13.00 31. 31. ; 51 on rubble pillar above ramp 52 53 9.82 213. -16.5 *end 142to41 *begin 142side ; formerly "SQ" and "SP" surveys *date 1983 *team Insts *team Tape *team Notes *instrument compass 111368 (added to photocopy in ink) ; Calibration: None *ref " very scrotty photocopy of original notes in AERW's archive - no" ; sketching included ; ====== stations refindable to link to other surveys: ====== ;*export 1 ; start of survey - no clue where *export 14 ; painted cairn in middle of passage on main route ;*export 21 ; top of 1 foot cairn at top of 1 metre climb 1 2 9.35 299. 56. 2 3 3.4 315. 27. 3 4 5.55 215.5 -22. 4 5 4.5 270.5 -43. 5 6 8.37 227. -30. 6 7 7.68 267.5 -27. 7 8 4.28 341.5 -10.5 8 9 3.45 319.5 33.5 9 10 2.31 254. 30. 10 11 7.6 241. -10.5 11 12 8.5 228. -11. 12 13 10.7 248.5 13. 13 14 15.37 210. -25. 14 15 5.59 163. 7. 15 16 8.22 198. -5. 16 17 10.75 171. 9. 17 18 6.20 251.5 11. 18 19 13.6 178.5 12. 19 20 7.29 199. 13. 20 21 9.07 165.5 10.5 ; ON .3M CAIRN ; Up Wiggies' Way on SP1 3 4.07 5. 31. SP1 SP2 16.52 316. 45. *end 142side *begin 41to142 ; formerly "TB" survey. A different connection from 142to41 *date 1995.07.30 ; recorded as '1985'. seems likely to be trip 1985-142-2 on 1985.07.30 ; in which case it would be Mike M, Gavin & Tina *team unknown Mike M, Gavin & Tina *instrument *team Tape *team Notes *instrument ; Calibration: None? ; Ref.: Photocopied single page ("p 17") of squared-paper exercise book (which ; appears to be back of 1985 logbook) with transcribed figures in AERW's ; archive. Yet to trace copy of original notes (I know I've got these ; somewhere, because I can remember being impressed with the sketching) ; ====== stations refindable to link to other surveys: ====== *export bolt ; bolt at head of 32m pitch into Big Chamber *export 0 ; floor at foot of rope on 32m pitch *export 13 ; boulder in chamber at foot of 18m pitch in 41 ;CHANGE 0.0 0.0 1985 data assumed OK bolt 0 29.64 - Down ; NB 1983 figure was 32m ! 1 0 7.62 245.5 -3. 1 2 18.75 26. 13. 3 2 14.59 216. -35. 3 4 8.65 93.5 50. 5 4 7.17 313. -44. 5 6 3.3 1. -22. 7 6 6.06 246. -16.5 7 8 6.93 155. 27.5 9 8 10.14 11. -43. 9 10 10.9 249.5 36. 11 10 18.5 15. -30. 11 12 14.6 220.5 35. 11 13 12.83 110. -33.5 ; 13 T19 0. assumed the same boulder again ! *end 41to142 *begin 142Bcha ; formerly "VE" survey ; Locn: SE flank Vord. Schwarzmooskogel, Western massif, Totes Gebirge, Austria ; Cave: Stellerweghöhle back entrance (142) *title "Big Chamber" *date 1985.08.11 ; deduced - "Sunday evening", trip 1985-142-3 *team unknown Gavin, Mike TA, Chris, Tina *instrument *team Tape *team Notes ; Calibration: None ; Ref.: Photocopies of transcribed notes from squared-paper exercise book ; (back of 1985 log) in AERW's archive, pages 35 and 36 ; ====== stations refindable to link to other surveys: ====== *export 1 ; floor at foot of rope on 32m pitch (assumed same point) ; transcribed notes say "survey mark at bottom of pitch" 2 1 3.17 320. -21. 2 3 3.7 45. -9. 4 3 11.39 231. -15. 4 5 9.5 62. -11. 6 5 8.45 150.5 -30.5 6 7 10.91 65.5 42. 6 8 9.13 99.5 45. 6 9 9.9 113.5 34. 6 10 16.38 118. 32.5 6 11 13.97 249. -21.5 12 11 6.65 58. -3.5 13 11 5.68 3.5 21. 13 14 8.35 207.5 1. 1 14 6.03 1. -.5 1 15 6.83 198. 1.5 16 15 9.21 57.5 24. 16 17 22.28 237. -12. 18 17 17.96 35.5 12. 19 17 8.4 160. 13. 19 20 6.82 11.5 14. 21 20 7.4 222. -29. 21 22 12.85 29. 6. 23 22 13.33 220.5 18.5 23 24 14.39 147.5 40. 25 24 7.76 230. -16. 25 12 5.02 323. -39.5 *end 142Bcha *end 142
No differences - file was saved