CUCC Expeditions to Austria: 1976 - 2022
Home
|
CUCC
|
expo.survex
|
Handbook
|
Log in
264
|
290
|
359
|
Survex
|
All Survex
|
Scans
|
Upload Scans
|
Drawings
|
Upload Drawings
|
Upload Photos
|
290 (FGH)
|
264 (Balkonhöhle)
|
Data Issues
|
tasks to do
|
caves
|
QMs
|
ents
|
expoers
|
survey lengths
|
statistics
|
Wallets(2022)
|
Expo(2022)
|
Control panel
|
Survex File: caves-1623/144/drucken/cuccrest
; Eingang und Weiterweg im p144 ;1995.08.01 AERW Source: converted from SU file $.Survey.Surveys.Austria.D.P144 ;1998.01.28 AERW added comments and refs ;1998.05.29 AERW sorted exports and format ;1999.09.28 TM split surveys into two files, from older dataset ;2000.05.11 W Concatenated forked versions ;20.11.00 TM changed file for use as addition to ARGE survey (2000) *begin cuccrest ; Locn: SE flank Vord. Schwarzmooskogel, Western massif, Totes Gebirge, Austria ; Cave: Weißen Warze Schacht II ; Survey Name: Survey 144 to bottom and up inlet ; Date: 1983.08.09 trip 1983-144-6 in 1983 logbook ("DP" survey) ; By: Insts: Dave Brindle ; Tape: ; Notes: Pete Lancaster ; Instruments: Pennine Compass and Clino ; Calibration: *ref " landscape-format brown-hardback notebook in AndyW's archive pp 15-26" ; ====== stations refindable to link to other surveys: ====== ;*export 0 ; edge of doline ;*export 20 ; bolt at head of mud wall pitch *date 1983.08.09 *DATA normal from to length bearing gradient ;CHANGE 0.0 0.0 144 Survey 1983. Compass OK. ;GRADE USE 5N ; 0 1 4.5 269. -49. ; 1 2 3.6 236. -50. ; 2 3 3.5 279. -52. ; 3 4 6.9 256. -53. ; 4 5 16.1 - Down ; 5 6 2.6 7. 28. ; 6 7 15.5 9. -78. ; 7 8 24.4 - Down ; 8 9 17.1 - Down ; 9 10 7.7 296. -40. ; 10 11 9.1 326. -55. ; 11 12 22.9 - Down ; 12 13 5.3 261. -36. ; 13 14 21.9 277. -73. ; 14 15 11.3 274. -34. ; 15 16 18.7 255. -26. ; 16 17 28.0 - Down ; 17 18 6.4 279. 22. ; 18 19 5.5 279. -38. ; 19 20 0.8 205. -50. ; 20 21 10.5 - Down 21 22 9.8 273. 44. 22 23 13.4 245. 8. 23 24 12.3 231. -9. 24 25 3.0 236. -42. 25 26 24.8 274. -67. 26 27 4.3 7. -45. 27 28 14.6 316. -58. 28 29 11.5 302. -58. 29 30 8.7 271. -59. 30 31 4.6 317. -55. 31 32 7.3 281. -61. 32 33 6.5 297. -39. 33 34 9.7 288. -45. 34 35 3.1 345. -5. 35 36 13.0 - Down 34 37 4.4 321. 4. 37 38 5.9 317. -9. 38 39 4.9 289. 15. 39 40 10.4 317. 40. 40 41 9.9 346. 24. 41 42 14.7 297. 35. 42 43 10.8 305. 35. 43 44 14.7 317. 46. 44 45 7.5 354. 27. 45 46 4.9 280. 51. ;station details ; 0 edge of doline ; 1 ; 2 bottom of doline ; 3 just back from first bolt ; 4 second bolt ; 5 foot of pitch 3m above floor of blind pit ; 6 on perched boulders, head of 2nd pitch ; 7 bolt on ledge, head of big pitch ; 8 ledge halfway down big pitch, 3m wide ; 9 foot of big pitch, above 5m pitch ; 10 edge of boulders ; 11 bolt for pitch on nipple in roof ; 12 foot of pitch, boulder floor ; 13 thread belay in narrow slot ; 14 knob of rock rh wall almost at foot of pitch ; 15 bolt (with thread backup) in 5m high passage before pitch ; 16 pitch head bolt at end of traverse ; 17 foot of pitch ; 18 above traverse (apparently not at bolt) ; 19 just above pitch head bolt ; 20 bolt (permanent station) ; 21 foot of pitch, parting of the ways ; 22 boulder in floor, 7m high passage ; 23 floor beyond ramp down left ; 24 projection in roof near backup for pitch ; several side passages here ; 25 thread belay ; 26 bottom of edelrid, start of interalp ; a particularly useful description, given this trip also derigged ! ; 27 random point on rope ; 28 random point on rope ; 29 random point on rope ; 30 end of 53m interalp, start of cut interalp ; hmmm. that's the 53m interalp I used in Tatham Wife 4 days ago (1998.01.24) ; 31 0.5m above bolt ; 32 swing off p14 halfway down ; 33 just above c5, passage 10m high ; 34 sootmark near floor, 4m wide, 15m high passage ; 35 takeoff of pitch ; 36 bottom of p13m, way on too tight on 210 degrees ; 37 ; 38 start of ramp up ; 39 at bottom of ramp ; 40 roof projection, 2m wide, 2m high passage ; 41 tube continues ; 42 0.9m high, 1.1m wide tube with small notch in floor ; 43 slight inward draught ; 44 just before junction ; 45 in passage to right (left smaller) ; 46 meets tiny vadose trench, small draufht from upstream ; downstream meets other way from 45, continues too tight *end cuccrest
No differences - file was saved