258

Thu 09 Aug 2012
Serena



T/U: 6 hrs


We faffed an unspeakably long time until we finally reached 258 entrance some time after 2 pm. The rigging was deemed not to be up to the exacting CUCC standards (and my lack of height). So Frank spent about 2 hours with the aim of making it idiot proof. SUCCESS! Frank showed me around until we reached Stirfish junction. We turned back and then it was my time to navigate out. SUCCESS. All in all a lovely day =) New Rigging Topo for Fat Cat (2012-08-08)

Edit this entry.

Survex files on this date:
    caves-1623/281/gruenstein
    caves-1623/204/midlevel/dogdays
    caves-1623/204/midlevel/dogdays2
    caves-1623/204/midlevel/farfromsupport
Wallets on this date:
    2012#05 ['notes1', 'plan']
    2012#10 ['plan1', 'notes1', 'notes2']
    2012#22 ['traverse-sketch-elev', 'traverse', 'temp', 'traverse-sketch-0', 'traverse']
Logbook trips on this date:
    258
    204 - Cirque de Soleil
CONNECTION! 161-204

    83 - original route