204 - 204a - The New Gaffered Rigging Guide
Sun 15 Jul 2007
Nial Peters
Nial Peters
Notes
- Pitches 4-8 can all be strung together with 150-160m rope
- 11mm rope is preferable due to the large amounts of mud
- Take a scrubbing brush to the bottom of Trihang for washing
ascenders and wellies
- Tying the bottom of the Cerberus pitch rope to something would be a
good idea - it is easy to pull up the end with you!
- Possible QM above Trihang pitch head. Up and behind the pitch head
appears to be a tube heading left. Requires bolting up to (although only
a couple of metres).