204 - Rigging Gaffered

Fri 13 Jul 2007
Nial Peters



The plan was to rig to the underworld in one trip, so with over 300m of rope between us (200m of 11mm in Big Bertha - which was a mistake!) we set off. The rigging went quite fast and several improvements over the old rig were found. However, we had accidentally left all the spits and cones on the surface. When we reached Trihang and decided it needed a new bolt therefore, we had no option but to turn back. The return trip was much easier given we no longer had any rope to carry! The round trip was 7.5hrs at an easy pace.

Edit this entry.

Survex files on this date:
    caves-1623/271/271
    caves-1623/2007-70/2007-70
    caves-1623/204/trunk/crowningglory2
    caves-1623/204/rhino/shanks
    caves-1623/204/rhino/spittersend
    surface/1623/near06_2007
Wallets on this date:
    2007#01 ['notes']
    2007#03 ['notes2', 'notes1']
    2007#05 ['notes4', 'notes2', 'notes6', 'notes1', 'notes3', 'shetland-elev', 'notes5', '…
    2007#06 ['notes2', 'notes1']
    2007#12 ['notes2', 'notes1', 'notes3', 'elev', 'plan']
    2007#96 surface ['austria2007notes-0014-82-to-85']
Logbook trips on this date:
    97 - Prospecting Beyond 97
    204 - Kiwi Suit Rig
    204 - Rhino Rift
    204 - Rigging Gaffered