204 - Rigging Gaffered
Fri 13 Jul 2007
Nial Peters
Nial Peters
The plan was to rig to the underworld in one trip, so with over 300m
of rope between us (200m of 11mm in Big Bertha - which was a mistake!)
we set off. The rigging went quite fast and several improvements over
the old rig were found. However, we had accidentally left all the spits
and cones on the surface. When we reached Trihang and decided it needed
a new bolt therefore, we had no option but to turn back. The return trip
was much easier given we no longer had any rope to carry! The round trip
was 7.5hrs at an easy pace.