115 - 15th/16th [actually 16/17th]

1982 calendar page     full logbook     logbook report

place: 115

Mon 16 Aug 1982    Wed 18 Aug 1982

CaverT/UPrevNext
Andy Dolby Fri 13 Aug 1982 Wed 18 Aug 1982
Andy Waddington Sat 14 Aug 1982
Mon 16 Aug 1982
Andy Waddington

Completed surveying of 115 by surveying from bottom of ramp to part way down the connection. Went on to camp sketching as we went. Had a quick meal at camp and started carrying the streamway tackle out. Found them too heavy and left them at various stages on our journey. Came out at 1.30 pm.

~ 18½ hours

Final derigging trip Derigging trip (same overnight)

Edit this entry.

Survex files on this date:
    caves-1623/115/cucc/115top
    caves-1623/115/cucc/phreas
No wallets files found for this date.
Logbook trips on this date:
    115 - Monday / Tuesday 115 Derigging
    115 - 15th/16th [actually 16/17th]