115 - 15th/16th [actually 16/17th]
Mon 16 Aug 1982
Andy Waddington
Andy Waddington
Completed surveying of 115 by surveying from bottom of ramp to part way down the connection. Went on to camp sketching as we went. Had a quick meal at camp and started carrying the streamway tackle out. Found them too heavy and left them at various stages on our journey. Came out at 1.30 pm.
~ 18½ hours
Final derigging trip Derigging trip (same overnight)