115 - Friday / Saturday 13/14 August 115 Derigging & Surveying

Fri 13 Aug 1982
Pete Lancaster

Got down to the bottom in about 5 hours, where we ritually peed in the sump and photographed it. Its rather similar to the one in Penyghent, in a rift, and looking as if it goes deep. There is a small passage going up above the sump, but it is full of boulders and we didn't think it was the time to start digging. We surveyed and derigged the two big pitches in 5 hours and managed to take the tackle thru the duck before it all got too much and we left it at the head of the last streamway pitch. 4½ hours, 60 stations and 5 bars of chocolate later we decided we were bored with surveying and jacked in at the head of last year's undescended pitch. We arrived back at camp after 16½ hrs caving and ate a vast amount before we went to bed. We met Chas & Dave at the camp, then Andy + Mike who relieved us of tackle bags at the bottom of the rift pitches. The entry was rather slow due to severe abrasion problems in very sensitive areas. Just managed to see the fireworks as we came out.

Pete

32 hours

Edit this entry.

Survex files on this date:
    caves-1623/115/cucc/orgasm
No wallets files found for this date.
Logbook trips on this date:
    113
    Dachstein walking trip
    115 - Friday / Saturday 13/14 August 115 Derigging & Surveying