161 - Pushing Team

1988 calendar page     full logbook     logbook report

place: 161

Fri 26 Aug 1988    Fri 26 Aug 1988

CaverT/UPrevNext
Keith Millar Sat 20 Aug 1988 Sun 04 Sep 1988
Mark Roddick Wed 24 Aug 1988 Sun 28 Aug 1988
Fri 26 Aug 1988
Mark Roddick



Down with that lot [arrow to previous page] just as rain starts. Down thru C+B's 'crawl' & rig Adrian down a couple of pitches - one a v.g. rig down - down to where C+B lobbed rocks down 8 seconds. We found a similar fall.

Tried to rig a bolt but v.v.v.v bad & won't go in anywhere (rock disintegration on touch). Natural to big boulder, via 2 natural deviations to good hang to ledge (20m) then walk down rift (~5-10°) to a bridge (20m) off dodgy bolt & down to floor (5m)

[elevation]

Next trip/ Previous trip
Survey trip/ Other survey trip on same day.

Edit this entry.

Survex files on this date:
    caves-1623/161/france/adrian
No wallets files found for this date.
Logbook trips on this date:
    162 - horribly early
    158, 159, 160, 161, 162, 163 - Fri Team 158 'push'
    161 - 'Survey' team 2
    161 - Pushing Team
    161 - Survey (!!) Team 1