158, 159, 160, 161, 162, 163 - Fri Team 158 'push'
Tina White
Finished rigging 158. Mike went to the eyehole that we thought might be worth hitting with a hammer. It wasn't worth hitting with the hammer. He says it was very small and after 10 mins hitting vigourously it was around ½ inch bigger. However we did recover a bolting hammer left from last year. We derigged most of the cave and left the rope at the bottom of the short climb after the squeeze. The walk back was disgusting - cold wet misty dark ughh and ~4 am.
Time underground ~8 hours _NB_
(provisional) number assignments so far
159 - 'The one Chris + Becka found that isn't B10'
160 - Jared's Hole
161 - Rabbit Hole
163 - Adam's Hole (1)
162 - Adam's Hole (2)
164 - Hugh's hole Friday - everyone else did:
Hugh + Penny - walked along the Stogerweg
Jo, Jane, Mark F, Mark R - portered loads in and out of camp 1
-Ian - slept - [crossed out]