CUCC Expeditions to Austria: 1976 - 2022
Home
|
CUCC
|
expo.survex
|
Handbook
|
Log in
264
|
290
|
359
|
Survex
|
All Survex
|
Scans
|
Upload Scans
|
Drawings
|
Upload Drawings
|
Upload Photos
|
290 (FGH)
|
264 (Balkonhöhle)
|
Data Issues
|
tasks to do
|
caves
|
QMs
|
ents
|
expoers
|
survey lengths
|
statistics
|
Wallets(2022)
|
Expo(2022)
|
Control panel
|
Survex File: caves-1623/204/rhino/onamission
*begin onamission ; Locn: Totes Gebirge, Austria - Loser/Augst-Eck Plateau (kataster group 1623) ; Cave: Steinbruckenhöhle, 1623/204 *title "On a Mission" *date 2003.07.26 *team Insts Becka Lawson *team Notes Julian Haines *instrument set 3 ; Calibration: stone bridge 147/+23 328/-23 *ref 2003#06 ; ====== stations refindable to link to other surveys: ====== *export 5 6 8 10 20 21 28 31 35 *calibrate tape +0.0 ; +ve if tape was too short, -ve if too long 2 1 7.67 182 -01 ; reversed in notes 3 2 6.43 100 -12 3 4 4.39 258 -04 5 4 14.98 146 +14 5 6 8.99 317 +04 7 6 10.34 110 +22 7 8 10.28 282 -17 9 8 2.48 148 +07 9 10 5.31 023 +13 11 10 5.57 122 +16 11 12 7.85 204 -18 13 12 4.37 311 -12 13 14 4.09 072 +12 8 14 1.95 001 -41 11 15 11.58 228 -21 16 15 8.27 096 +14 16 17 14.25 024 +13 18 17 16.62 154 -01 19 18 4.47 152 -34 19 20 4.72 331 +08 21 19 12.19 220 -22 22 19 3.07 001 +10 22 23 8.07 214 -17 24 23 2.16 079 +24 24 25 4.46 205 -08 26 25 2.84 078 +35 26 27 3.14 238 -04 27 28 4.18 343 +05 27 29 2.87 - down 30 29 4.02 042 +10 31 30 1.29 102 -01 32 1 6.10 - down 33 32 3.52 - down 34 33 1.46 261 -05 34 35 1.35 208 +26 ;station details ;name L R U D description ;1 1.0 0.0 - 3.0 RP on flake 3m above pitch floor ;2 2.0 2.0 - 0.3 RP on boulder at rift intersection ; number 2 marked ;3 1.0 0.2 4.0 2.0 RP RW of rift ;4 0.0 1.2 1.5 2.2 RP number 4 LW ;5 0.3 1.5 3.0 1.5 RP LW near cross-rift ;6 1.2 0.0 3.5 2.2 RP RW at intersection ;7 0.3 2.0 3.5 0.5 RP LW ;8 0.0 1.5 3.0 1.5 RP LW at junction number 8 marked ;9 0.0 1.0 3.0 1.6 RP LW at junction ;10 0.3 1.8 2.5 1.5 RP LW at junction number 10 marked ;11 1.5 0.2 3.0 1.7 RP RW at junction on cauliflower ;12 0.8 0.0 0.8 0.6 CM on nobble over crawl junction ;13 0.2 0.4 1.2 0.3 RP RW opposite junction ;14 1.5 0.5 4.0 0.5 CM corner of floor choss ;15 2.0 0.0 4.0 0.5 RP on wall corner RW ;16 0.0 1.2 3.5 2.0 RP on corner marked no. 16 ;17 0.9 0.8 3.5 0.2 CM on boulder mid-passage at bend ;18 1.3 0.3 4.0 1.5 RP RW entrance to chamber ; number 18 marked ;19 0.3 2.5 4.5 1.5 RP number 19 opposite wall of ; chamber ;20 1.2 0.3 4.0 1.2 RP RW ;21 1.0 0.0 0.4 1.0 RP number 21 RW ;22 2.5 1.0 2.5 1.7 RP overhanging wall nobble RW ;23 0.0 0.7 0.8 2.0 CM nobble LW ;24 0.6 0.0 1.2 1.5 RP RW ;25 0.0 1.0 0.8 3.0 RP LW ;26 0.3 0.25 1.8 1.8 RP LW on nobble ;27 0.0 1.0 1.6 2.8 CM LW ;28 0.6 0.1 1.0 0.6 RP on flake overlooking shaft ; (window) ;29 0.6 0.2 4.0 0.2 RP on boulder on floor ;30 0.0 0.5 1.3 0.4 RP LW ;31 0.5 1.5 0.2 3.5 RP ceiling nobble overlooking rift ; (window) ;32 - - - - RP on pitch ;33 - - - - RP on pitch ;34 - - - - RP pitch-head ;35 - - - - RP connection at pitch-head opposite ; rift entrance *end onamission
No differences - file was saved