CUCC Expeditions to Austria: 1976 - 2022
Home
|
CUCC
|
expo.survex
|
Handbook
|
Log in
264
|
290
|
359
|
Survex
|
All Survex
|
Scans
|
Upload Scans
|
Drawings
|
Upload Drawings
|
Upload Photos
|
290 (FGH)
|
264 (Balkonhöhle)
|
Data Issues
|
tasks to do
|
caves
|
QMs
|
ents
|
expoers
|
survey lengths
|
statistics
|
Wallets(2022)
|
Expo(2022)
|
Control panel
|
Survex File: caves-1623/161/phumour/thighs
;1998.03.26 AERW sort begin/end, add comments, refs, exports, *calib clino ;2009.07.27 AJD fettled title *begin thighs ; Cave: 1623/161, Kaninchenhöhle ; Locn: Totes Gebirge, Austria ; "Between the Thighs (QM 95-40 - Puerile Humour Series)" *title "Between the Thighs" *date 1996.07.05 ; - trip 1996-161-1 in logbook *team Insts Phil Underwood *team Notes Steve Bellhouse *team Pics Steve Bellhouse *team Tape Matthew Hicks *instrument Set 3 ; Calibration: Using new cairns at Scarface, which might ; be crap as there is a big height difference ; Up compass 253.5, 257,252 ; clino +33,+33,+33 ; down compass 072,072.5,072 ; clino -33.5,-33,-33.5 ; Tape -22cm as crappy new tapes have zero 22cm from end. ; We didnt leapfrog as we only had one working carbide ; Ref.: 1996 KH survey book pp 74-79 ; ====== stations refindable to link to other surveys: ====== *export 1 ; CM boulder on slope up R in TP2, directly below entry to PH *export 4 ; CM RH wall near tall thin rock, top of handline above Amyl Nitrate *export 17 ; CM RH wall above pitch at start of Natural City *calibrate clino -0.17 *calibrate tape -0.22 ;From to Tape Compass Clino 1 2 28.35 104 +14 2 3 6.96 080 +13 3 4 26.40 114 +10 4 5 14.36 066 -00.5 5 6 14.15 091 +24 6 7 6.20 141 +30 7 8 19.65 155 +32 6 9 14.92 017 -14 9 10 6.35 133 +03 10 11 10.56 339 -07 11 12 12.80 278 +30 6 12 20.61 354 +06 ; Cave: 1623/161, Kaninchenhöhle ; Locn: Totes Gebirge, Austria *title "2nd survey in Between the Thighs" *date 1996.07.11 ; - trip 1996-161-6 in logbook *team Insts Matthew *team Notes Ralph *team Pics Steve *team Tape Ralph ; Calibration: Unfortunate page-falling-out fuck up. It might turn up but ; we used the old crap cairns anyway. ; Ref.: 1996 KH survey book pp 75-79 (same sketches as above survey) ;F T Tape Comp Clino 13 9 6.75 130 +22 13 14 10.10 332 -20 14 15 7.74 325 +01 ;change to Steve for tape & notes 11 16 1.94 091 +03 17 16 7.54 215 +24 ;stn L R U D description ;1 - - - - CM on top of boulder ;2 3.5 0.5 0.5 0.5 CM spur RH wall, 'tween Saarlacc/Amyl Nitrate ;3 2 4 1 1 CM spur LH wall, ditto ;4 5 0 2.5 1.5 CM RH wall near tall thin rock, top of handline ;5 0 10 5 1 CM LH wall, opposite Genital Wart ;6 3 0 5 2 CM RH wall, R of 3 large boulders ;7 5 1 2 1 CM RH wall ;8 2.5 1 1.5 0 On floor, 2m from end of passage (Zits) ;9 1 3 2 0.5 CM RHS of boulder in mouth of smaller passage ;10 3 0.5 1.5 0.5 Crap CM low on RH wall ;(stn 11 LRUD taken facing mud slope) ;11 4 0 5 1 Crap CM 2m L of crawl ;12 4 2 12 0.5 Nose on boulder, RHS at top of mud slope ;13 4 6 6 1 Top of boulder in middle of chamber ;14 4 0 5 1.5 CM RH wall ;15 1.5 2 1 2 CM at end of passage ;16 3 1 5 2 CM above hole ;17 2 1 6 0.5 CM RH wall above pitch *end thighs
No differences - file was saved