Homecoming - Investingating around Radogast

2023 calendar page     full logbook     logbook report

place: Homecoming

Thu 13 Jul 2023    Fri 14 Jul 2023

CaverT/UPrevNext
Jono Sat 08 Jul 2023 Fri 14 Jul 2023
Sarah Sat 08 Jul 2023 Fri 14 Jul 2023
Will Tue 11 Jul 2023 Fri 14 Jul 2023
Zac Thu 06 Jul 2023 Tue 18 Jul 2023
Thu 13 Jul 2023
Zac

The day started out bleak with the plateau overcast and still soaked from the night before. Zac and Sarah set out from top camp while will and Jono came from base. We all bumped into each other at homecoming which was excellent timing. We proceeded to garlic cave for some lunch where Zac and Sarah got very cold. Phillip joined us there also. we waited for the rain to die away then headed over to homecoming. Sarah followed by Zac, then Will then Jono. The plan was to re-rig the small pitch and traverse after Radogast as well as investigate a phreatic tube 5m bellow the Radogast pitch head. each of these were to be done in pairs but the plan was scrapped when Jono needed the longer rope from Sarah (exploring Radogast) to re rig the pitch and the traverse. In the end Zac re-rigged it under Jono's supervision while the other 2 stood around.

Sarah then ascended Radogast and rigged a new rope to swing over to the tube. Having been unsuccessful Zac then valiantly tried for half an hour until everyone got cold. Ascending, Zac saw a great spot for a deviation.

We then all exited the cave to the tying light, Zac and Sarah first followed by Will and Jono.
One the way back to top, Zac slipped and pulled his arm/ scraped his arse meaning Mike had to apply cream to it at top camp. A bit of a faffy trip but an important step for making progress.

Edit this entry.

No survex files found for this date.
No wallets files found for this date.
Logbook trips on this date:
    festering - Via Ferrata "Panorama Kletterstieg Sisi"
    UK Caving Blog post: two weeks on
    Homecoming - Investingating around Radogast