143

1984 calendar page     full logbook     logbook report

Unknown

Tue 31 Jul 1984    Tue 31 Jul 1984

CaverT/UPrevNext
Mike Martin Sun 29 Jul 1984 Thu 02 Aug 1984
Pete Lancaster Sun 29 Jul 1984 Thu 02 Aug 1984
Tue 31 Jul 1984
Mike Martin

The inevitable happened ! 143 had to be rigged to look for the connection! Walk in very hot so an hour was spent cooling in the entrance. Rigged to bottom + investigated squeeze. After much destruction of rock, squeezing the way on was pronounced impassable for all except midgets who can pass 5" (12 cm) squeezes. It is heading the right way + it does appear to open up marginally but the aven in "41 connection" can't be seen. The draught is very similar + a voice connection and/or midget is required.

Time underground 2.00 pm
Time out 6.30 pm
4½ hours

Previous trip (last year)

Edit this entry.

No survex files found for this date.
No wallets files found for this date.
Logbook trips on this date:
    STEINSCHLAG - SCHACHTE DERIGGING
    143
    TrisselBerg