STEINSCHLAG - SCHACHTE DERIGGING

1984 calendar page     full logbook     logbook report

STEINSCHLAG

Mon 30 Jul 1984    Tue 31 Jul 1984

CaverT/UPrevNext
Bill Hawkswell Sun 29 Jul 1984 Thu 02 Aug 1984
John Parrington Mon 30 Jul 1984 Thu 02 Aug 1984
Tue 31 Jul 1984
Bill Hawkswell

Due to extremely hot day is was a very sweaty walk up. Abbed down to -120m and decided to have a quick look down a parallel unexplored shaft. This required a fairly desperate step across the rift (and even worse coming back) - but to no avail. It connected at the side and bottom with the rift which had already been explored.

So - derigged & John's light failed at the foot of the entrance (110 ft) pitch. So he had a bit of a hassle at the rebelay and kicked a few rocks down which make a very nasty sound when you're at the bottom.

Coming out we followed the wrong set of cairns to find the path to Wolfhohle !!

Time underground 1.07
Time out 8.48
- 7½ hours

Previous trip / Next trip - not for a further 13 years !

Edit this entry.

No survex files found for this date.
No wallets files found for this date.
Logbook trips on this date:
    STEINSCHLAG - SCHACHTE DERIGGING
    143
    TrisselBerg