132 - Thursday 18th [actually 19th] 132 Derigging
Thu 19 Aug 1982
Mike Thomas
Mike Thomas
We derigged 132 in 1½ hrs, then surface surveyed from the lower to the upper entrance of 41; and took lots + lots of bearings on the Trisselwand.
1½ hours.