Surface survey P4 to 152 via 151, 150

1985 calendar page     full logbook     logbook report

Unknown

Sat 03 Aug 1985    Sun 04 Aug 1985

CaverT/UPrevNext
Brian Derby Thu 01 Aug 1985 Thu 08 Aug 1985
Caroline Smith
Mark Roddick Fri 02 Aug 1985 Wed 07 Aug 1985
Mike Martin Thu 01 Aug 1985 Sun 04 Aug 1985
Sat 03 Aug 1985
Brian Derby

Survey Team, Mark + Brian

Went down 152 to re-rig where necessary and survey out. Chris's pitch was examined and found wanting in most things pitches need - like belays. Two bolts put in, one by Brian put in by 6' 4" back contorted into pitch head, Mark's midget frame inserted one in a few minutes - and it was all the way in. Said farewell to Mike and Gavin grunting and groaning in the rift. Surveyed out in five hours plus took a few photos of the formations and some very nice moonmilk in Boulder Chamber. Surveyed in 40 legs. Time in 8 p.m. 4/8, out 6 a.m. 5/8. Time underground 10 hours.

Brian.

Edit this entry.

Survex files on this date:
    caves-1623/152/bananacon
    surface/1623/stoger
No wallets files found for this date.
Logbook trips on this date:
    152 Push
    Surface survey P4 to 152 via 151, 150