115 - Schnellzughöhle 115

1982 calendar page     full logbook     logbook report

115

Thu 29 Jul 1982    Sat 31 Jul 1982

CaverT/UPrevNext
Andy Dolby Thu 29 Jul 1982 Thu 05 Aug 1982
Chas Butcher Wed 28 Jul 1982 Mon 02 Aug 1982
Fri 30 Jul 1982
Chas Butcher

A leisurely start saw us underground by 3 O'Clock. The memory has faded by now but we rigged the last three year's pitches. The next is a pleasant 10m pitch and shortly afterwards a slightly bigger pitch we didn't go down. At the time we thought it might be a climb but it definitely isn't.

We took some food and a stove down to the sump bypass and had a brew of disgusting soup in the Big Chamber on the way out.

Oh and we put backup bolts on some of the other streamway pitches. Out at 5.20 in the dawn light. Andy kept falling asleep on the walk back.

14 hrs

Next trip/ Previous trip

 
 
 
 
 
 

''There is a very large blank space in the logbook here suggesting an omitted write-up that no-one ever got round to.''

Edit this entry.

No survex files found for this date.
No wallets files found for this date.
Logbook trips on this date:
    115 - Schnellzughöhle 115