Continue Rebolt/Rig Tunnocks Entrance

2014 calendar page     full logbook     logbook report

Unknown

Thu 24 Jul 2014    Fri 25 Jul 2014

CaverT/UPrevNext
Anthony Wed 23 Jul 2014 Sat 26 Jul 2014
Jess Wed 23 Jul 2014 Sat 26 Jul 2014
Fri 25 Jul 2014
Anthony



Two days after our previous effort, the same team returned to continue the attempted re-rig of the Tunnocks entrance pitch. I swung around in the shaft putting in an airy-fairy rig to avoid the loose choss while Jess sat on a rubble slope providing moral support. One deviation and two y-hangs later, team 2 arrived with the intention of putting in a quick `n' dirty rig to the bottom so they could start rigging the rest of the cave. After a few hours sitting with six of us strung out along the pitch with much shuffling of gear, it became clear that this plan was not going to work, so team 1 exited.

Edit this entry.

No survex files found for this date.
No wallets files found for this date.
Logbook trips on this date:
    Continue Rebolt/Rig Tunnocks Entrance
    Team 2 into Tunnocks
    3rd Rigging in Trip (107)