258 Rigging String Theory
Mon 29 Jul 2013
Holly
Holly
Changed rope at top of pitch from 80m to 40m then carried on using
80m at large Y-hang at ledge. Hung about on rope for 3 hrs whilst
locating spits. was very disappointed in self for not getting to floor
and leaving Anthonu to get very cold at top of pitch. However first
pitch of this size that I've ever attempted to rig, so happy with self
for the attempt at least.