258 derig
Tue 16 Aug 2011
Emma
Emma
['Andy' resumed to be 'Andy C' for no good reason..]
Quick trip down to the top of String Theory for me and Martin to pick up the bags of rope we'd left there after de-rigging string theory and below. Left all traverse lines in cave as they were all on old rope - only Caramel Catharsis & traverse to [unreadable] pitch was derigged. Andy, Holly & Noel derigged caramel catharsis & the entrance pitch after us - thankfully as some of the entrance derig must have been interesting. Last trip of expo for us [sad emoji].