204e derig

2006 calendar page     full logbook     logbook report

Unknown

Wed 09 Aug 2006    Thu 10 Aug 2006

CaverT/UPrevNext
Phil Underwood Tue 08 Aug 2006 Mon 14 Aug 2006
Wed 09 Aug 2006
Phil Underwood

Despatched to finish off stuff in 204. Went to Crowning Glory and placed a 12m permanent rope on the airy climb up at the end. This could do with a bolt placing to eliminate a rub point and make it a proper SRT pitch. 98m rope collected. Big Cross [wrong word? cairns? crocs?] at conservation tape placed in aven under 2002-07. Derigged most of e entrance pitch, but left Y-hang at the top and coiled the rope over it. Knots also left in to ease rigging next year.

Edit this entry.

Survex files on this date:
    caves-1623/298/298
    caves-1623/B4/B4
    caves-1623/204/trunk/fblink
    caves-1623/204/trunk/wotnosurvey
    caves-1623/204/trunk/goesser2
    caves-1623/258/sauerkraut
    surface/1623/36tob4
    surface/1623/2004-18to298
Wallets on this date:
    2005#05 ['notes2', 'notes1']
    2006#26 ['notes0001', 'notes0002', 'extend', 'plan']
    2006#27 ['notes2', 'notes1']
    2006#29 ['notes2', 'notes1', 'extend', 'plan']
Logbook trips on this date:
    Stuff in 204
    More surface stuff
    204e derig