2004-19 - Finish 2004-12

2004 calendar page     full logbook     logbook report

place: 2004-19

Wed 04 Aug 2004    Thu 05 Aug 2004

CaverT/UPrevNext
Brian Sun 01 Aug 2004 Thu 05 Aug 2004
Julian Sun 01 Aug 2004
Tony Sun 01 Aug 2004 Thu 05 Aug 2004
Wed 04 Aug 2004
Brian



Followed draft into the cave, and investigated all obvious + easy leads. Draft was emerging from tight tube at floor level. This was squeezed to a small chamber. Still drafting. Rocks were removed and the way was squeezed to a second small chamber. Still drafting. Brian removed rocks outwards then Julian kicked rocks in to pass another squeeze into a roomier boulder slope. Downslope emerged into walking/stooping sized passage which was quickly by recognised by Julian as Iceland of KH. Found a red paint survey spot from 2003 G entrance resurvey and surveyed out from this. Exited cave and walked back to 204 via cliff.

[Ed: So 2004-12 is actually just another entrance to 1623-161.]

En route back Tony found a horizontal entrance that he investigated: horizontal phreas to T-junction, upslope to choked chamber entrance, downslope to more horizontal phreas bypassing pitch in floor. Tony exited. We went home. Cave tagged 2004-19.

Edit this entry.

Survex files on this date:
    caves-1623/76/pitch
    caves-1623/161/phumour/161h
Wallets on this date:
    2004#45 ['161hnotes']
Logbook trips on this date:
    204 - Finish derigging Gaffered
    204 - derigging continued
    76 - Brave New World pitch series
    2004-15 - Surface work near Hauchhöhle part 2
    2004-19 - Finish 2004-12