204 - Continue surveying in Rhino Rift + On a Mission

Sun 27 Jul 2003
Becka Lawson



First went to the end of the 25/7/03 survey of Rhino Rift + continued until we ran out of horizontal + I put a bit (not enough) of conservation tape around the mud pretties. Cold. Then down Deviated Pitch + showed Julian On A Mission. Surveyed Rat Biscuit to frustrating end in drafting boulders (lost most of the draft before then though?) Finished up by surveying into Belief (last leg before main chamber, in the phreatic passage).

T/U 9 hours

Edit this entry.

Survex files on this date:
    caves-1623/246/246
    caves-1623/204/rhino/rhinorift2
    caves-1623/204/rhino/ratbiscuit
    caves-1623/204/rhino/belief
Wallets on this date:
    2003#09 ['notes4', 'notes2', 'notes6', 'notes1', 'notes3', 'notes7', 'plan1', 'plan2', …
    2003#11 ['notes2', 'notes1', '2003-05plan', '2003-05elev']
Logbook trips on this date:
    204 - Continue surveying in Rhino Rift + On a Mission