142 - 41 CONNECTION SURVEYING AND DERIGGING

Tue 09 Aug 1983
Gail Smith

PMS, BGS Blasted on down to the foot of the pitch in Stellerweg and surveyed back to one of Dave's survey marks in the chamber before the big chamber in 142.

Went down the big pitch, admired the bolts and denigrated the rigging. Wandered around Big Chamber with bolting kit looking for Mike's hole in the floor but didn't find it. It all looked pretty broken up, somewhere through that lot there must be a crawl bypass to the big pitch.

Came out and derigged. On the way back did a couple more survey stations at the points where our & Dave's surveys diverged slightly.

Out to stars and a leisurely walk back. Back at camp at 0130.

7½ hours underground PMS + BGS

P.S. dusty phreatic passages that have not been touched since the last ice age are not recommended for contact lens wearers.

Previous trip / Next trip (next year)

Edit this entry.

Survex files on this date:
    caves-1623/144/cuccrest
    surface/1623/p136
    caves-1623/142/cucc/cucc142
    caves-1623/144/arge/cuccrest
    caves-1623/144/cucc/144
    caves-1623/144/cucc/144main
    caves-1623/144/drucken/144
    caves-1623/144/drucken/144main
    caves-1623/144/drucken/cuccrest
Wallets on this date:
    1983#04 WHole cave area sketches ['Loser-big-area-1985', 'Loser-area-to-col-1985', 'Loser-area-1984']
    1983#05 comparative elevations ['elevs-severalcaves']
    1983#06 whole cave survey sketches ['IMG_20210503_110628', 'IMG_20210503_110734', 'image05-05-2021-130411-4', 'ima…
Logbook trips on this date:
    SURFACE SURVEYING / ROPE REMOVING
    142 - 41 CONNECTION SURVEYING AND DERIGGING
    wolf
    Tony's 2nd Hole 144