136 - Steinschlag
Mon 08 Aug 1983
Chas Butcher
Chas Butcher
_Pushing, surveying & derigging trip_
We pushed on another pitch or two. At about -150m we met phreatic ramps at about 45° but then descended below this into a clean shaft again. Placed a final bolt and plumbed the pitch with the tape but didn't go down it. Depth 194m to top of this pitch which is >30m so at least 224m total depth.
The exit was enlivened by Chas dropping his stinky sealing ring down a hole in the boulders in the Big Chamber. Cave seems to be going strong.
7 hrs