115 - Monday / Tuesday 115 Derigging

1982 calendar page     full logbook     logbook report

115

Sat 14 Aug 1982    Mon 16 Aug 1982

CaverT/UPrevNext
Mike Thomas Sat 14 Aug 1982 Thu 19 Aug 1982
Pete Lancaster Fri 13 Aug 1982 Thu 19 Aug 1982
Mon 16 Aug 1982
Mike Thomas

Spent many hours hauling 4 amazingly heavy tackle bags up from top of Lake Pitch to camp, then carried 2 on to Stellerweg chamber where we rigged a rope down the climb. So to bed, only to be woken by Andy & Andy at ~3 in the morning. Next day we derigged to camp, had a bonfire with the rubbish & carried all the gear back to Big Chamber. The inlet pitches were extremely wet indeed. So we left the tackle bags we were carrying at the top of chamber pitch + got ourselves out. But to redeem the situation we brought one of the heavy tackle bags Andy + Andy had left at the last rift pitch.

31½ hours

Final derigging trip survey/Sherpa trip (same overnight)

Edit this entry.

Survex files on this date:
    caves-1623/115/cucc/115top
    caves-1623/115/cucc/phreas
No wallets files found for this date.
Logbook trips on this date:
    115 - Monday / Tuesday 115 Derigging
    115 - 15th/16th [actually 16/17th]