CUCC Expeditions to Austria: 1976 - 2022
Home
|
CUCC
|
expo.survex
|
Handbook
|
Log in
264
|
290
|
359
|
Survex
|
All Survex
|
Scans
|
Upload Scans
|
Drawings
|
Upload Drawings
|
Upload Photos
|
290 (FGH)
|
359 (Homecoming)
|
Data Issues
|
tasks to do
|
caves
|
ents
|
expoers
|
survey lengths
|
statistics
|
Expo2018
|
Expo2019
|
import/export
|
Django admin
Survex File: caves-1623/2017-cucc-28/canyon
*begin canyon ; stations linked into other surveys (or likely to) *export 7 C14 C16 C10 ; Cave: Fisch Gesicht Hoehle ; Area in cave: Entrance ; Meander to Canyon: Blitzen Boulevard *title "Blitzen Boulevard" *date 2017.08.13 *team Insts Alice Shackley *team Notes Mike Butcher *instrument CHECC Disto ; Calibration: None *ref 2017#53 ; Centreline data *data normal from to length bearing gradient ignoreall 7 C1 9.70 200.4 -74.9 C1 C2 7.91 134.4 +06.2 C2 C3 3.35 128.8 +10.2 C3 C4 2.72 166.9 -30.9 C4 C5 3.30 117.2 +07.1 C5 C6 3.90 192.6 -21.7 C6 C7 6.86 199.8 -10.3 C7 C8 1.82 158.7 +14.0 C8 C9 5.00 217.8 -29.7 C9 C10 24.54 305.7 -86.1 C9 C11 33.81 280.7 -89.1 C11 C12 8.10 293.9 -00.3 C11 C13 8.00 110.2 +14.9 C13 C14 14.75 007.6 +31.9 C13 C15 6.01 008.9 +18.8 C15 C16 5.88 036.1 -05.8 C16 C16splay 14.75 151.0 -88.2 C14 C14splay 14.06 006.1 +06.5 ;----------- ;recorded station details ;LRUDs arranged into passage tubes *data passage station left right up down ignoreall 7 0 1.5 16.9 23.8 Y-hang. continues from icytube survey station C1 1.1 1.4 6.7 0.0 C2 0.7 0.0 2.7 4.5 C3 0.0 0.6 2.5 5.8 C4 0.0 1.0 4.0 5.0 C5 0.0 2.0 4.0 5.0 C6 1.0 0.0 4.7 4.4 C7 0.0 0.5 5.5 27.0 C8 0.0 0.5 4.5 12.0 C9 1.0 0.5 5.0 24.8 C11 1.0 1.0 33 1.5 C13 2.0 0.0 10 0.0 C12 0.0 1.5 33 1.5 C15 0.0 0.4 13.2 13.0 C16 0.0 0.4 4.0 5.0 ;----------- ;Question Mark List ;(leave commented-out) ;Serial number grade(A/B/C/X) nearest-station resolution-station description ;QM1 B canyon.C10 - part way down the 35m pitch there is a ledge, possibly phreatic with the stream having cut down through it forming the pitch,the ledge possibly continuing at a higher level ;QM2 A canyon.C16splay blitzen_to_liquidluck.1d continuation of the meadering rift at depth, 15m pitch undropped ;QM3 A canyon.C14splay - phreatic tube after a 3m climb up on the left hand side ;------------ ;Cave description ;(leave commented-out) ;freeform text describing this section of the cave ; Continuation icytube from the y-hang swinging across the pitch to the south-west, the other side of the flake. Passage starts as a meandering rift, drops a 33m pitch into a canyon with a stream at the bottom. Passage continues with more rift leading to an undropped 15m pitch and also climbs upwards c3 to phreatic tubes. *end canyon
No differences - file was saved