Frank Tully : 2004

133.3 m surveyed this year.

Other years:  | 2002 | 2003 | 2004 | 2005 | 2007 | 2008 | 2009 | 2010 | 2012 | 2015 | 2016 | 2018 | 2022 | 2023

Status of all wallets for Frank Tully

Table of all trips and surveys aligned by date

DateTripsSurveys
July 31, 2004 204 - Subsoil 204 earthenware 89.8 m
Aug. 2, 2004 253 43.5 m
-- 2002-03to253 0.0 m
-- 253to2004-14 0.0 m
Aug. 4, 2004 204 - derigging continued 204