Eislufthöhle - rigged

Wed 08 Aug 1979
Julian Griffiths

Eislufthöhle

Plodded down to last pitch of last year. Julian then went off and derigged the dry route whilst I bolted the rebelay for the twelfth. Descended 30m in damp rift to an 'under over' (go over; the under's wet). Almost immediately occurs a 50m pitch, split once. At the bottom is a 5m free climb as the shaft levels out. Next is a pitch of about 20-25m. The belays are both natural, but the backup is a little near the lip of the pitch (be warned). From the bottom a large platform is the takeoff to a pitch of about 20m. These pitches are a little damp, especially after rain. Total depth ~500m at least. Time ~ 8 hrs.