Explorers
CUCC 2000
Underground Description
Entrance A leads to daylight chamber, down an awkward climb, whilst entrance B is a snow and boulder slope to the same chamber. To the right leads to another chamber, which ent H drops into, and a slope up to the left about 2m up the wall leads to entrance D. Continuing on stooping passage leads to a climb which emerges under a stone bridge which contains entrances E, F and G. A crawl at ground level between A & B leads to some loose slopes and entrance I. From the day light chamber the passage to the left leads quickly to a 3m climb down into the largest chamber of the cave. From here around to the left leads to entrance shaft C, and a passage leads off the other side of the shaft that is walking height leading to climbs up over boulders with a loose ceiling above. This leads to a T junction, which ends in boulders to the right and a short climb to a dead end to the left. To the right in the largest chamber, a wide low short passage leads to an ice-floored chamber. Crawling passage then leads to the deepest chmber, which has an ice flow into and down the chamber. At the opposite end of the chamber a 3m climb is reached, which was climbed and quickly closed down.
Survey

Survey of 231
Underground Centre Line
In dataset
Survex File
CaveView display of the .3d file is temporarily disabled while we fix things (Nov.2021). See /handbook/computing/todo.html.
3d file download for this cave
survex file for this cave
Scanned survey notes
1623-231