Michael Sargent : 2014

194.9 m surveyed this year.

Other years: | 2014 | 2015 | 2016 | 2017 | 2018 | 2019

Table of all trips and surveys aligned by date

DateTripsSurveys
July 25, 2014 Team 2 into Tunnocks
July 29, 2014 107 - Gemshohle - Finalising Nipped Down rigging + Pushing lead in Southern China - "The Last TSA" 1623-107 1 notes inst dog 39.9 m
July 30, 2014 258 - Tunnocks - Sightseeing and C lead at the top of String Theory (09-44C) 1623-258 trireme inst notes dog dog 25.7 m
Aug. 1, 2014 Surface prospecting, NW of Tunnocks
Aug. 2, 2014 Checking Ants in Your Pants for snow level
Aug. 3, 2014 2014-888 and MF - unmarked pit
Aug. 5, 2014 SRT practice
Aug. 7, 2014 2005-05 Balcony Höhle lemonsnout notes instrument 129.3 m

Horrible bug here but only when there is more than one survex block per day, e.g. see Wookey 1999 where there are 3 eiscream survex blocks on 5th August. it duplicates the entry but gets it wrong. The length from the first block is displayed twice but there should be 3 rows: eiscream, eiscream2, eiscream3.

Fortunately it is just this display on this page which is wrong: no bad calculations get into the database.

The interaction of django database query idioms with django HTML templating language is a bit impenetrable here.
- The template is in troggle/templates/personexpedition.html
- The code is in function personexpedition() which calls GetPersonChronology() in troggle/core/views_logbooks.py
- the connection between the two is made in the URL resolver in troggle/urls.py

To be fixed!