258 Rigging String Theory

Mon 29 Jul 2013



Changed rope at top of pitch from 80m to 40m then carried on using 80m at large Y-hang at ledge. Hung about on rope for 3 hrs whilst locating spits. was very disappointed in self for not getting to floor and leaving Anthonu to get very cold at top of pitch. However first pitch of this size that I've ever attempted to rig, so happy with self for the attempt at least.