rig niflheim

Thu 10 Aug 1989
Del Robinson



Intending to rig Niflheim but carrying 200m rope is knackering. Bag popped through squeeze v. easy (!!) and _then_ Adam decided he'd like 50m of it. Slow rigging left us halfway down pitch from Arrow chamber. Fun at squeeze + out.

Main Route rigging / D&S aborted / Right Hand Route / Alternative Shopper (all same day)

Edit this entry.

No survex files found for this date.
No wallets files found for this date.
Logbook trips on this date:
    DS survey
    mellow trip
    fools
    Rerigging trip
    rig niflheim