rig niflheim
Thu 10 Aug 1989
Del Robinson
Del Robinson
Intending to rig Niflheim but carrying 200m rope is knackering. Bag popped through squeeze v. easy (!!) and _then_ Adam decided he'd like 50m of it. Slow rigging left us halfway down pitch from Arrow chamber. Fun at squeeze + out.
Main Route rigging / D&S aborted / Right Hand Route / Alternative Shopper (all same day)