204 - Rigging Gaffered

Fri 13 Jul 2007



The plan was to rig to the underworld in one trip, so with over 300m of rope between us (200m of 11mm in Big Bertha - which was a mistake!) we set off. The rigging went quite fast and several improvements over the old rig were found. However, we had accidentally left all the spits and cones on the surface. When we reached Trihang and decided it needed a new bolt therefore, we had no option but to turn back. The return trip was much easier given we no longer had any rope to carry! The round trip was 7.5hrs at an easy pace.