CUCC Expeditions to Austria: 1976 - 2021
Website home
|
Sign up
|
Log in
All Survex
|
Scans
|
Drawing files
|
290 (FGH)
|
291 (GSH)
|
359 (Homecoming)
|
Surveys-204
|
Expo2018
|
Expo2019
|
cucc server
|
expo server
|
tasks to do
|
caves
|
people
|
all expeditions
|
statistics
|
import/export data
Django admin
Survex File: caves-1623/161/triassic/triassic
;1998.03.02 AERW sort begin/end, add comments and refs, some *calib clino ;1998.04.02 AERW added exports, fixed error in scarface point descriptions (25 was red blob ; and 26 omitted, 26 should be red blob, I've added 25) ;2018.02.02 W Add *passage info ;2020.07.09 PMS fixed bad *team lines ; ====== links between surveys in this file: ====== *equate triassic.pt1.31 scarface.7 *equate triassic.pt3.9 minoan.0 *begin triassic *export pt1.1 pt1.2 pt1.27 pt1.31 pt1.34 pt1.35 pt1.38 *export pt2.3 pt2.9 pt2.11 pt2.13 *export pt3.2 pt3.5 pt3.7 pt3.8 pt3.9 ; ====== links between surveys making up the Triassic survey: ====== *equate pt1.41 pt2.1 *equate pt2.17 pt3.1 *begin pt1 ; Cave: 1623/161, Kaninchenhöhle ; Locn: Totes Gebirge, Austria *title "from Fudge Brownie to halfway down Triassic Park" *date 1995.07.27 ; trip 1995-161-26 in logbook *team Pics Wookey *team Notes Anthony *team Notes AndyA *team instrument Duncan/Scout ;Calib: Tape: +20 (20cms missing) LRUDs are correct (ie 20cm allowed for) ; set 4 Comp:246, 246.5, 246 ; calibrate Clino +7,+7.5,+7.5;-6,-6,-6 : calib +0.67 ; Set 2 also used - no calib. treat as calib 0 *ref "1995 survey book pp 30-33" ; ====== stations refindable to link to other surveys: ====== *export 1 ; CM above way in from Fudge Brownie *export 2 ; CM on opposite side of chamber *export 27 ; CM on boulder 'S27', west side of Staudnwirt Palace *export 31 ; CM stone 'S31' near wall between Salt Lake City and 161d passage *export 34 ; CM rock 's34' at Shortage of Walls *export 35 ; CM rock 's35', middle of TP1 just before entry to Alternative Universe *export 38 *export 41 ; CM roof, RH side of TP1 before canyon to Moth Chamber *calibrate tape +0.2 *calibrate clino +0.67 2 1 7.54 332 -10 3 1 9.99 290 -25 3 4 2.07 161 +10 ;change comp+clino to set 2 *calibrate clino 0 5 4 13.50 216.5 -04 5 6 2.50 357 00 7 6 1.08 277 -16 7 8 2.30 341 +24 8 9 2.50 016 -04 9 10 2.14 036 -22 11 10 4.88 233 -16 11 12 7.19 149 -01 13 12 4.47 318 -12 13 14 4.45 101 +6.5 15 14 14.61 196 -08 15 16 9.00 081 +8.5 17 16 6.20 270 -12 17 18 7.15 063 +03 19 18 5.82 193 -12 20 18 5.95 333 -17 20 21 4.41 202 -15 21 22 4.78 - UP 23 22 3.85 087 -27 23 24 8.94 149 +14 25 24 4.33 042 -09 25 26 10.60 108 +13 ;change to comp+clino set 4 *calibrate clino +0.67 27 26 7.42 273 -27 ;change inst->scout, notes->andy 28 27 16.56 298 -17 28 29 19.97 021 +04 ;change clino back to set 2 *calibrate clino 0 30 29 29.71 200 -01 30 31 15.56 071 00 32 31 11.70 250 -17 32 33 7.72 024 +19 34 33 22.00 214 +02 34 35 27.69 053 +08 36 35 19.00 251 -09 36 37 28.93 044 +09 38 37 18.96 219 -08 ;change to comp+clino set 2 38 39 12.50 030 -04 40 39 13.32 226 -08 ;change to comp 4, clino 2 40 41 22.40 065 +04 42 41 22.83 187 +04 ;original LRUDs ;station left right up down ;1 - - - - CM above way in from Fudge Brownie ;2 - - - - CM on opposite side of chamber ;3 0 0.5 0.9 1.3 CM on LH wall of passage ;4 - - - - CM on RH wall at junction ;5 - - - - CM at junction ;6 0 0.6 0.9 0.6 CM on LH wall ;7 - - - - CM on RH wall ;8 0 0.5 0.3 0.2 Point on flake LH wall ;9 0.2 0.2 1 0 Peg at start of tight bit ;10 - - - - CM on RH wall at junction ;11 0 3.3 0.7 0.6 CM LH wall ;12 0.6 0.2 1 0.3 bottom of pendule ;13 1.7 0.4 1.2 0.8 CM RH wall ;14 2.55 0.7 1.4 1 CM RH wall ;15 0.2 1.6 1.0 1.3 CM on flake ;16 .8 .5 1.25 1 CM on pendule ;17 1 2.5 .2 1.1 point on LH wall ;18 - - - - CM on boulder at junction ;19 - - - - point at end of side passage ;20 0 1.4 1 1.6 CM LH wall ;21 - - - - rock at foot of plumb ;22 - - - - nobble at pitch head ;23 - - - - CM on wall ;24 - - - - top of boulder ;25 - - - - CM on wall ;26 - - - - CM on roof ;27 4.5 4.0 1.5 .8 CM on boulder ;28 12 2.5 11 3.5 CM on RH wall ;29 2.5 2.5 3 3 CM point on rock ;30 2.9 3.4 5 1 CM rock ;31 3.5 .5 .5 .4 CM stone 'S31' ;32 2.8 .2 7 1 CM RH wall 's32' ;33 .5 3.5 LW 1 CM lh wall pendule (LW=long way) ;34 - 3 1.5 .6 CM rock 's34' ;35 8 8.5 LW 0 CM rock 's35' ;36 4.5 6 EF 0.1 CM stone 's36' (EF=even further) ;37 4 4.5 2.5 0 Carbide Flame ;38 6 5 2 .5 Top of rock 's38' ;39 3 8 2 .3 rock ;40 0 7.5 3 1.5 CM LH wall ;41 12 1 2 3 CM roof ;42 - - - - CM LH wall in canyon *data passage station left right up down ignoreall ;Passage data 1 - - - - CM above way in from Fudge Brownie 2 - - - - CM on opposite side of chamber 3 0 0.5 0.9 1.3 CM on LH wall of passage 4 0 0.5 2.5 0 CM on RH wall at junction 5 - - - - CM at junction 6 0 0.6 0.9 0.6 CM on LH wall 7 - - - - CM on RH wall 8 0 0.5 0.3 0.2 Point on flake LH wall 9 0.2 0.2 1 0 Peg at start of tight bit 10 - - - - CM on RH wall at junction 11 0 3.3 0.7 0.6 CM LH wall 12 0.6 0.2 1 0.3 bottom of pendule 13 1.7 0.4 1.2 0.8 CM RH wall 14 2.55 0.7 1.4 1 CM RH wall 15 0.2 1.6 1.0 1.3 CM on flake 16 0.8 0.5 1.25 1 CM on pendule 17 1 2.5 0.2 1.1 point on LH wall 18 - - - - CM on boulder at junction 19 - - - - point at end of side passage 20 0 1.4 1 1.6 CM LH wall 21 - - - - rock at foot of plumb 22 - - - - nobble at pitch head 23 - - - - CM on wall 24 - - - - top of boulder 25 - - - - CM on wall 26 - - - - CM on roof 27 4.5 4.0 1.5 0.8 CM on boulder 28 12 2.5 11 3.5 CM on RH wall 29 2.5 2.5 3 3 CM point on rock 30 2.9 3.4 5 1 CM rock 31 3.5 0.5 0.5 0.4 CM stone 'S31' 32 2.8 0.2 7 1 CM RH wall 's32' 33 0.5 3.5 15 1 CM lh wall pendule (LW=long way) 34 - 3 1.5 0.6 CM rock 's34' 35 8 8.5 15 0 CM rock 's35' 36 4.5 6 20 0.1 CM stone 's36' (EF=even further) 37 4 4.5 2.5 0 Carbide Flame 38 6 5 2 0.5 Top of rock 's38' 39 3 8 2 0.3 rock 40 0 7.5 3 1.5 CM LH wall 41 12 1 2 3 CM roof 42 - - - - CM LH wall in canyon *end pt1 *begin pt2 ; Cave: 1623/161, Kaninchenhöhle ; Locn: Totes Gebirge, Austria *title "More Triassic Park (Part II)" *date 1995.07.28 ; trip 1995-161-27 in logbook *team Insts Duncan *team Tape Kate *team Tape Duncan *team Notes Kate *team Pics Steve ; calibrate Compass clino set 4 ; Calibration: "as before (p30)" ie. clino +0.67 ; from to tape compass clino ; Katie can't actually read any of the notes *ref "1995 survey book pp 36-41" ; ====== stations refindable to link to other surveys: ====== *export 1 ; CM R wall/roof, TP1 before canyon to Moth Chamber *export 3 ; CM L wall, above climb out of canyon after Moth Cha., just before Dr. Snuggles *export 9 ; CM L wall, opposite huge boulder, just before Ring Piece Junction *export 11 ; CM boulder on slope up R, directly below entry to Puerile Humour *export 13 *export 17 ; CM "S17" R wall, just above climb down into TP3 (best climb is on left) *calibrate tape +0.2 *calibrate clino +0.67 2 1 29.79 186 +03 2 3 8.48 249 +38 4 3 24.34 200 +04 4 5 8.80 033.5 +13 6 5 29.82 134 +01 6 7 27.09 296 -16 8 7 17.58 141 +04 8 9 23.35 265 -12 10 9 27.28 167 +06 10 11 25.31 352 +09 12 11 20.75 177 -27 12 13 11.48 359 +10 14 13 29.55 126 +02 14 15 29.13 295 -10.5 16 15 29.80 104.5 +13 16 17 10.96 326 -12 ;1 - - - - CM R wall ;2 - - - - CM ceiling ;3 1.0 9 2 2.0 CM L wall ;4 2.2 1.0 7 1.8 CM top of boulder on floor (wider in roof) ;5 4.1 0.6 7 2 CM corner of rock on R wall ;6 4 4 0.5 1.9 CM ceiling ;7 0 6.8 3 1.1 CM on white patch L wall ;8 7 5 4 2 CM top of boulder ;9 0 12 1.3 1.6 CM L wall ;10 - - - - CM L wall ;11 14 14.5 5 1.0 CM boulder on slope up R ;12 - - - - CM top of boulder ;13 3.5 0.5 4 2 CM R wall ;14 5 4 3 1.5 CM R wall ;15 8 2 1 5 CM ceiling ;16 - - - - CM L wall ;17 6.2 0 4 1.5 CM R wall *end pt2 *begin pt3 ; Cave: 1623/161, Kaninchenhöhle ; Locn: Totes Gebirge, Austria *title "Triassic Park Part III" *date 1995.08.01 ; trip 1995-161-30 in logbook *team Notes AndyA *team Pics Wookey *team instrument SteveB *instrument set3 ; Calibration: (France 1995 cairns) ; set3 (fore) (back) ; calibrate comp 245,245.5,245 68,67,67 ; calibrate clino +8,+7,+8 -7,-7,-7 ; set4 (not used) ; calibrate comp 246,246,246 67,67,67.5 ; calibrate clino +8,+9,+8 -6,-6,-7 ; Tape is 20cm short (LRUDS are already corrected) *ref "1995 survey book pp 57-62" ; ====== stations refindable to link to other surveys: ====== *export 1 ; CM "S17" R wall, just above climb down into TP3 (best climb is on left) *export 2 *export 5 ; CM boulder 's5', NE side of Trifurcation *export 7 ; CM rock 's7' in middle at Bugger, below FCR climb/pitch *export 8 ; CM boulder point, edge of Minoan surprise pitch into Interview Blues *export 9 ; 's9' CM rock, between the three Minoan Surprise pitches *calibrate tape +0.20 *calibrate clino +0.67 1 2 29.39 243 -21 3 2 22.24 122 -01 3 4 29.44 244 -18 5 4 29.05 128 +09 5 6 26.75 348 +04 7 6 16.44 155 -08 5 8 19.15 201 -14 9 8 9.49 029 -08 ;LW = long way ;1 7 0 5 1 'S17' ;2 - - 15 0.5 's2' stal rock ;3 11 0.5 2.6 3.0 CM RH wall ;4 1.0 9 2.3 0.8 rock flake ;5 4 12.8 4 1.6 CM boulder 's5' ;6 7.8 7 3.5 3 CM on rock thingy ;7 7 7 15 0.3 CM rock 's7' ;8 5 5.5 2.6 1.2 CM boulder point ;9 6 7 LW - 's9' CM rock ;10 4.3 0.3 1.2 1.2 CM RH wall ; Cave: 1623/161, Kaninchenhöhle ; Locn: Totes Gebirge, Austria *title "Triassic Park Part III - Children's Railway, Loch Gosser" *date 1995.08.01 ; trip 1995-161-30 in logbook *team Notes Wookey *team Pics Wookey *team instrument AndyA ; same trip but steve has buggered off *instrument set3 ; Calib: ; set3 ; calibrate comp 245,245,245 67,67,67 ; calibrate clino +7,+7,+7 -7,-7,-7 ; (set4 ; calibrate comp 245.5, 245.5, 245 67,67,66.5 ; calibrate clino +9,+9,+9 -6,-6,-6) *ref "1995 survey book pp 57-62" *calibrate clino 0 2 10 15.76 099.5 +25 *units length feet 11 10 99.0833 293.5 -07 ;length was 99ft 1inch *units length metres 11 12 11.42 113 +02 13 12 11.89 342.5 +08 13 14 16.26 109 -1.5 15 14 23.56 333 -01 15 16 19.24 127 -02 ;11 1.2 1.2 1.8 0.6 LH wall pencil mark ;12 CM LH side ;13 0.8 0.9 0 1.8 CM roof ;14 0.1 1.7 2.9 1.4 CM LH wall ;15 2.7 0.8 1.7 1.7 RH wall ;16 5.5 3.3 1.7 0.9 Cairn on boulder,edge of rift *end pt3 *end triassic *begin scarface ; Cave: 1623/161, Kaninchenhöhle ; Locn: Totes Gebirge, Austria *title "161d - scarface entrance connection to Salt Lake City" *date 1995.07.31 ; trip 1995-161-29 in logbook *team Notes Wookey *team instrument AndyA ; Calibration: (at France (161c) 1995 cairns) ; set3: ; calibrate Comp 246,246,246 (fore) 67,67,67 (back) ; calibrate Clino +7,+7,+7, (fore) -7,-7,-7 (back) ; (set2: (not used) ; calibrate Comp 246.5,246.5,246.5 (fore) 68,68,68 (back) ; calibrate Clino +7,+7.5,+7.5 (fore) -7,-7,-7 (back)) ; Tape has 20cm missing. All LRUDs are correct, surveyed legs are not corrected. *ref "1995 survey book pp 49-52" ; ====== stations refindable to link to other surveys: ====== *export 7 ; CM stone 'S31' near wall between Salt Lake City and 161d passage *export 26 ; red paint blob on edge of entrance roof below '161d' marking *calibrate tape +0.20 *calibrate clino 0 1 2 27.85 317.5 -13 3 2 16.48 141.5 +04 3 4 7.82 039.5 -00 5 4 17.20 125 +9.5 5 6 9.70 032.5 +09 6 7 6.97 288 -17 2 8 14.57 042 -1.5 9 8 22.31 279.5 -09 9 10 16.35 109 +19 10 11 11.13 090 +21 10 12 5.64 142 +23 13 12 2.71 357.5 -02 13 14 9.26 142 +20 15 14 2.49 032 -48 15 16 5.16 117 +07.5 17 16 3.36 214 -06 17 18 8.41 027 -05 18 19 6.94 299.5 -10.5 20 18 8.45 244 +29 20 21 15.87 094 +18.5 21 22 1.34 - UP 23 22 7.32 350 -04.5 23 24 5.28 182 +21.5 24 25 5.03 152 -03.5 26 25 2.25 000 -21 ;stn L r u d comment ;1 1 3 2 1.7 CM LH wall ;2 0 4.5 3.5 1.1 CM LH wall ;3 see map 1 0.9 Tip of stal ;4 3.8 0 1 1.2 RH wall ;5 0 2.8 1.2 0.3 LH wall ;6 - - - 1.6 'X' tip of boulder ;7 Rock on floor on Triassic Survey ;8 1.2 1.1 0.6 0.1 Rock on floor ;9 5 1.3 2 0.4 CM on rock ;10 4.2 - 0.1 1.6 's10' on rock tip ;11 0 2.8 0.8 0.5 CM LH wall ;12 1 0.6 0.2 1.0 CM Rh wall (pillar) ;13 0.4 - 0.5 0.2 Rock on floor ;14 0.7 1 0.5 0 Rock on floor ;15 1.6 0 0.2 1.2 RH wall ;16 2.4 1.8 0.3 0 rock on floor ;17 0.7 0.4 0.7 0 floor ;18 CM roof pencil '18' ;19 2 2.5 4 0.9 pencil '19' above choke ;20 0.5 2.1 1.9 0.4 CM rock on floor ;21 0.2 1.1 1.5 0.5 CM LH wall ;22 0.2 1.1 0.1 1.9 CM LH wall ;23 0.4 2.2 0.3 0.6 CM LH wall ;24 0.1 0.7 0.7 0.8 CM LH wall ;25 - - - - CM LH wall, edge of entrance ;26 red paint blob on edge of entrance roof below '161d' marking *end scarface *begin minoan ; Cave: 1623/161, Kaninchenhöhle ; Locn: Totes Gebirge, Austria *title "Minoan Surprise pitch" *date 1996.07.17 ; trip 1996-161-23 in logbook *team Notes Julian Todd *team instrument Becka Lawson *instrument set 2 ; Calibration: at scarface ; a->b 214, +8 ; b->a 032, -8 *ref "1996 KH survey book pp 116-117" ; survey doesn't connect to anything in Knossos, so see further survey ; KnossosConn in RHR.TBlocks (but not in survey book...) ; ====== stations refindable to link to other surveys: ====== *export 0 ; 's9' CM rock, between the three Minoan Surprise pitches *export 4 ; top of huge boulder in floor of Knossos, marked "phi" *calibrate tape 0 1 0 8.95 006 +25 1 2 2.50 012.5 +23 3 2 13.72 049 +29 4 3 27.00 129 +41 *end minoan
none